Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in West Union, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in West Union, OH?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in West Union

Avatar for Groundworks
Groundworks
4.3(
341
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving West Union, OH and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2010

Free estimates

Warranties offered

"Iran H, Chris M and Floyd C were the service people from Ohio Basement Authority who repaired a leaning concrete block foundation wall in the basement and installed a sump pump. They did excellent, considerate work and I would recommend them for a similar project."
Crawl Space
Crawl Space
Crawl Space
Crawl Space
Crawl Space

+14

413 neighbors recently requested a quote
Recommended by89%of homeowners
Showing 1-10 of 14
Concrete Mudjacking questions, answered by experts

Costs range from $500 to $1,500, depending on the size and condition of the area.

Most houses are expected to settle over time, but foundation sinking of more than a few inches or uneven sinking of more than an inch for every 20 feet is cause for concern. Any significant or uneven sinking should be assessed by a professional to determine the cause and perform any necessary repairs. 

Mudjacking can be an expensive foundation repair process, but in many cases, it’s well worth the investment. This is especially true if you’re lifting a portion of sunken foundation slab back into place. In that case, mudjacking can help avoid major structural damage and even home collapse by restoring the integrity of your structure with minimally invasive procedures. Mudjacking a concrete patio, walkway, or sidewalk can be worthwhile because it removes tripping hazards and makes your outdoor area more aesthetically appealing.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The West Union, OH homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.