Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Seaman, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Seaman, OH?

Select your specific project to find the pro for you.

TRUSTED BY SEAMAN, OH HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon17
    Verified concrete mudjacking services reviews

Find Concrete mudjacking pros in Seaman

Avatar for Groundworks
Groundworks
4.3(
341
)
Concrete - Injection Leveling - MudjackingConcrete - Injection Leveling - Mudjacking - For Business

Serving Seaman, OH and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2010

Free estimates

Warranties offered

"Iran H, Chris M and Floyd C were the service people from Ohio Basement Authority who repaired a leaning concrete block foundation wall in the basement and installed a sump pump. They did excellent, considerate work and I would recommend them for a similar project."
Crawl Space
Crawl Space
Crawl Space
Crawl Space
Crawl Space

+14

500 neighbors recently requested a quote
Recommended by89%of homeowners
Showing 1-10 of 14
Concrete Mudjacking questions, answered by experts

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

The average cost for mudjacking is around $1,200, though prices can range from $300 to $3,400. On a per-square-foot basis, you can expect to pay between $3 and $8, with an average of about $5 per square foot. The final cost depends on several factors, including the square footage of the concrete, the type of slab, its accessibility, whether it is load-bearing, and the type of material used to lift it. Generally, lifting a driveway, small patio, or sidewalk is less expensive than lifting a slab foundation or garage floor.

Mudjacking restores level surfaces, prevents further damage, and is more cost-effective than a full replacement.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Yes, you can mudjack cracked concrete, but the cracks will need to be repaired once the concrete has been leveled. If the concrete is severely cracked in multiple places, replacement may be a better option, but for less severe cracking, mudjacking is a good solution as long as cracks are correctly caulked and sealed.

The Seaman, OH homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.