Top-rated basement remodelers.

Best basement remodelers near Wellston, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Wellston, OH?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Wellston - Updated Nov 2026

Avatar for Mid-State Basement Systems
Mid-State Basement Systems
5.0(
17
)
Basement - Remodel

Serving Wellston, OH and surrounding areas

Approved

In business since 1986

Free estimates

Emergency services offered

"I am amazed at The quality of their customer service. Before I became disabled, I was employed at the hospital for 28 years and I know how hard-working with the public can be. I really need to give a hats off and a pat on the back to (midstate Basement) systems they came in and did work on my basement and had to come back and adjust some things… Not one time did they roll their eyes or give me a hard way to go about it. Levi ,Judd, Ernest, Jonathan & Adrian were very friendly, courteous & Ernest, Levi and Judd always answered any question I give them and was quick to be of help and to get me scheduled in I would highly recommend Midstate Basements systems to anybody that needs any kind of basement or crawlspace work done. I had my basement done and I’m gonna have to have my crawlspace done in the future and they will definitely be the company I contact. You can’t go wrong by hiring them. Fast, friendly service, each and every time."
Before
After
Foundation Before
Foundation After
Modernized Basement

+6

Response time2 hrs
Response rate100%
5 neighbors recently requested a quote
Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)
Basement - Remodel

Serving Wellston, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Upon discovering water leaking into my basement i contacted buckeye waterproofing. Jerry Schieve, field supervisor came out and gave an estimate and scheduled the work.. Within 2 weeks the crew was at my home working. IT took 3 days to complete and everything went well.
"
Recommended by76%of homeowners
Knittels Construction
5.0(
7
)
Basement - Remodel

Serving Wellston, OH and surrounding areas

In business since 2015

Free estimates

Offers commercial services

"Chris and his team are hands down the best general contractors in southern Ohio. I hired him to do a total remodel in 2025, on a house that I purchased to flip. He was quick, efficient, and his quote was excellent. I’m a real estate broker and I’m picky about who I hire. I would not use anyone else and I will definitely hire him again."
New porch in Portsmouth
Metal roof
Cabin
Cabin
Cabin

+20

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Wellston, OH and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 48
Basement Remodel FAQs, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

The Wellston, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.