Top-rated basement remodelers.

Best basement remodelers near Chillicothe, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Chillicothe, OH?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Chillicothe - Updated Nov 2026

Avatar for Ortiz luxe builds & co
Ortiz luxe builds & co
New to Angi
Basement - Remodel

Serving Chillicothe, OH and surrounding areas

Approved

Free estimates

Small jobs welcome

Hi, my name is Jake Ortiz, and I’m the owner of Ortiz Luxebuilds & CO. We are a local, small renovation company focused on providing reliable, quality craftsmanship for homeowners looking to improve and maintain their properties.\n\nWe specialize in a variety of residential improvement projects, including deck builds and repairs, fencing, siding installation and repairs, interior and exterior painting, drywall work, framing, and other small renovation projects.\n\nAs a small business, we take pride in giving each customer personal attention, clear communication, and dependable workmanship from start to finish. Our goal is to make the renovation process as smooth as possible while delivering results that homeowners can be proud of.\n\nWhether you’re looking to update your home, repair damaged areas, or bring a new project idea to life, we’re here to help with honest service and quality work.

Avatar for Buckeye Waterproofing Inc
Buckeye Waterproofing Inc
4.1(
54
)
Basement - Remodel

Serving Chillicothe, OH and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"Upon discovering water leaking into my basement i contacted buckeye waterproofing. Jerry Schieve, field supervisor came out and gave an estimate and scheduled the work.. Within 2 weeks the crew was at my home working. IT took 3 days to complete and everything went well.
"
Recommended by76%of homeowners
Avatar for Sibert Pro Construction Inc
Sibert Pro Construction Inc
5.0(
15
)
Basement - Remodel

Serving Chillicothe, OH and surrounding areas

In business since 2000

Emergency services offered

Credit card accepted

"Mickey promptly came over to give us an estimate. They came when they were due and did an excellent job. They were clean and tidy. Th gutters & roof looked great after they cleaned them-also had the chimney repaired-excellent job-polite and respectful."
Additional Photos
Recommended by100%of homeowners
...
Showing 1-10 of 65
Basement Remodel FAQs, answered by experts

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Lifting a house and adding a basement is one way to add usable square footage. Lifting or jacking a house is a complex process, and it can be expensive, not to mention that you won’t be able to live in your house while it’s lifted, due to safety concerns. Lifting a house should only be done by experienced professionals.

Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.

Making a window in a basement larger costs an average of $4,200. You’ll need to pay an average of $550 to have a structural engineer plan the project, $500 to $1,500 for the installation labor, and an average of $2,200 for the excavation and window well installation. The remainder will go toward pulling permits, installing trim, and repairing drywall on the interior.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Chillicothe, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.