Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in South Point, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in South Point, OH?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in South Point

Avatar for Summit Landscapes
Summit Landscapes
5.0(
2
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving South Point, OH and surrounding areas

In business since 2010

Free estimates

Credit card accepted

"They did a really good job pulling out my bushes. Didnâ t disrupt the brick work around them that I was worried about. They cleaned up the area and hauled off the bushes. I would definitely use their service again."
Driveway repair/replace
Response time9 hrs
Recommended by100%of homeowners
Avatar for KC Form and Finish
KC Form and Finish
3.8(
8
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving South Point, OH and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"KC Forms and Finish were great to work with! The work was done in a timely manner, the cost was reasonable, and the customer service was great! The jobs finish was straight and the design was seen throughout the driveway. Would highly recommend them!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+1

Recommended by83%of homeowners
Showing 1-10 of 50
Asphalt Driveways questions, answered by experts

In most cases, you don’t need a permit to repave your driveway, although some exceptions exist. If you’re widening your driveway and plan on widening the apron as well, you’ll usually need a permit from the Department of Transportation in your area. This permit costs between $50 and $300 in most cases. Most municipalities will also require a certified and insured contractor do the work relating to the apron and curb cut. You can contact your building department or ask your paving company if you need a permit. Your driveway professional will usually pull the permit for you.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

Recycled asphalt is not better than gravel, but can be a good alternative. It is inexpensive, but not as low-cost as gravel, and doesn’t tend to last as long. Recycled asphalt isn’t as dusty as gravel and is more environmentally friendly. The black look can be something that homeowners prefer. No matter what, ensure you choose an experienced recycled asphalt contractor. 

The South Point, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.