Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Cortland, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Cortland, OH?

Select your specific project to find the pro for you.

TRUSTED BY CORTLAND, OH HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon41
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Cortland

Avatar for James Decorative Concrete
James Decorative Concrete
5.0(
11
)
Concrete Driveways - Install

Serving Cortland, OH and surrounding areas

Approved

In business since 2014

Free estimates

Customers say: Quick response

"His company ripped out my wooden deck. It was rotting away. They replaced it with their concrete decorative stamping. . The color is amazing. It looks remarkably like wood! I love it! Friendâ s comment on how cool it looks all the time!"
Wood plank sidewalk and steps
Recent Jobs
Recent Jobs
Recent Jobs
Recent Jobs

+64

Response time2 hrs
Response rate89%
2 neighbors recently requested a quote
...
Showing 1-10 of 124
Asphalt Driveways questions, answered by experts

Your city or county will have guidelines about the minimum and maximum width and length of private roads. The average private road is 12 feet wide, and length, of course, depends on your property. Requirements also depend on the amount of traffic and types of vehicles your road experiences. Check with local ordinances before planning a road on your property.

It’s best to weigh the pros and cons of each material and decide on your priorities for your driveway. Gravel won’t be an appropriate choice if your driveway experiences heavy traffic. You’ll find that you need to level and top it off regularly, which could make the material a much more expensive option.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

While some areas may allow for a slope of up to 20%, this is often the maximum slope for driveways, with a few exceptions of up to 25%. Other regions may have a maximum of 12%, 15%, or 18%, so check with your local building department to ensure you’re laying a driveway that is up to code for your location.

The material that’s best for your private road depends on your property, the climate in your area, and your personal preferences. Gravel is an affordable option, but some homeowners don’t like how it looks. It can be a pain to remove snow from, and it requires more ongoing maintenance than asphalt or concrete. However, while these other options require less maintenance and make snow removal a breeze, they’re more expensive and will need repairs from time to time. Ultimately, you’ll have to choose the road material that suits you and your property best.

The Cortland, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.