Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Cortland, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Cortland, OH?

Select your specific project to find the pro for you.

TRUSTED BY CORTLAND, OH HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon41
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Cortland

Avatar for James Decorative Concrete
James Decorative Concrete
5.0(
11
)
Concrete Driveways - Install

Serving Cortland, OH and surrounding areas

Approved

In business since 2014

Free estimates

Customers say: Quick response

"His company ripped out my wooden deck. It was rotting away. They replaced it with their concrete decorative stamping. . The color is amazing. It looks remarkably like wood! I love it! Friendâ s comment on how cool it looks all the time!"
Wood plank sidewalk and steps
Recent Jobs
Recent Jobs
Recent Jobs
Recent Jobs

+64

Response time2 hrs
Response rate89%
2 neighbors recently requested a quote
...
Showing 1-10 of 123
Asphalt Driveways questions, answered by experts

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

By grading and compacting the base soil, ensuring proper drainage and stability.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Yes, recycled asphalt driveway costs can be substantially lower than new asphalt. With new asphalt costing between $90 and $190 per ton, this option can cost as much as 10 times more than laying down asphalt millings.

The Cortland, OH homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.