Top-rated subcontractors.

Get matched with top subcontractors in Celina, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Celina, OH?

Select your specific project to find the pro for you.

TRUSTED BY CELINA, OH HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon84
    Verified subcontracting services reviews

Find Subcontractors in Celina

Avatar for Lynn Crist Construction
Lynn Crist Construction
5.0(
9
)
Major Home Repairs (General Contractor)

Serving Celina, OH and surrounding areas

Approved

Super Service Award Winner

In business since 1996

Free estimates

Customers say: Quick response

"Lynn replaced several floor joists and added extra support beams to the floors where needed. The job took about a week as he said it may take 5-7 days this added for unforeseen problems. He cleaned work area up every evening before leaving for the day.. hauled away any debris and scrap. There were a few small added items to his list and he didn’t mind taking care of those things also."
Lynn Crist Construction
Lynn Crist Construction
Lynn Crist Construction
Lynn Crist Construction
Lynn Crist Construction

+7

Response time12 hrs
3 neighbors recently requested a quote
Recommended by11%of homeowners
Avatar for Williams & Embry Restoration LLC
Williams & Embry Restoration LLC
4.8(
17
)
Major Home Repairs (General Contractor)

Serving Celina, OH and surrounding areas

In business since 2013

Free estimates

Emergency services offered

"I am a maintenance supervisor @ at Carriage House East in Indianapolis, and Williams & Embry Restoration provided Gutter Cleaning & Dryer Vent Cleaning at my property. They were efficient and very professional. They provided excellent service and I have already recommended them to my sister properties, and I have also informed my upper management about them as well, which will lead to them providing their services for our entire property portfolio. We will definitely continue to use their services in the future and continue to grow a great relationship as well."
Additional Photos
Recommended by92%of homeowners
RJE General Construction LLC
4.2(
18
)
Major Home Repairs (General Contractor)

Serving Celina, OH and surrounding areas

In business since 1988

Free estimates

Emergency services offered

"Very professional job. Top notch service and work ethic. Could never tell we had the ceiling repaired and the painting was perfect. I don't want to go on because I need them to come back to my house to paint the whole first floor and afraid they might become to busy. When you use them you will be as happy as I am."
Restaurant
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+59

Recommended by81%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Major Home Repairs (General Contractor)

Serving Celina, OH and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Showing 1-10 of 45
Subcontractors questions, answered by experts

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Costs depend on project complexity, software requirements, and the draftsperson’s experience.

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

It can take anywhere from a few days to several months to draw up architectural plans, depending on the complexity of your project. Architectural plans are highly detailed documents that take time to complete, and any changes or alterations can significantly extend how long they take.

The only real drawback to green building is that it’s more expensive up front, with per-square-foot prices sitting 33% higher than what you’d pay to build a traditional home. The higher cost is due to more expensive building materials and more labor to ensure every aspect of the home is as efficient as possible. However, green buildings often save money in the long run, so this is just a temporary downside.

The Celina, OH homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.