Top-rated basement remodelers.

Get matched with top basement remodelers in Blacklick, OH

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Blacklick, OH?

Select your specific project to find the pro for you.

TRUSTED BY BLACKLICK, OH HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon254
    Verified basement remodels reviews

Find Basement remodelers in Blacklick

Avatar for Finished Basements Plus Inc.
Finished Basements Plus Inc.
4.8(
113
)
Basement - Remodel

Serving Blacklick, OH and surrounding areas

Approved

Super Service Award Winner

In business since 1990

Free estimates

Emergency services offered

"After Receiving quotes from 4 companies, we went with Finished Basements Plus. Not only did they offer the best price, but also included all permits and quality features such as metal framing without us having to ask. Todd, Brian, and their crews were great to deal with throughout the whole project. If getting the job done right for a great price are your priorities (and not speed), these guys are a great choice. We plan on hiring them again to remodel our master bathroom."
entertainment center and wet bar.
9ft wet bar
Additional Photos
Additional Photos
Additional Photos

+34

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Steger Renovations
Steger Renovations
4.5(
31
)
Basement - Remodel

Serving Blacklick, OH and surrounding areas

Approved

In business since 2013

Free estimates

Emergency services offered

"We couldn’t be happier. The upstairs is beautiful. Tim kept everything cleaned up while working, showed up promptly and kept sub use to a minimum . Everyone who worked in our home went out of their way to make sure we understood all work, and were polite and respectful. Phase 1 went so well that we have hired Tim to do phase 2 - take the kitchen back to studs, move it to a new location, create a laundry room (it’s out of the basement now Yea!) and walk-in pantry, new half bath, change all electrical to white, wood floors, all new doors, new baseboards and crown molding. We are part way through phase 2 and couldn’t be happier. Our home is becoming the beautiful dream home we’ve always wanted. We feel blessed to have found Tim and highly recommend him. We never thought we would be one of those people that love their contractor, but we do."
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for David Richards Home Improvement
David Richards Home Improvement
4.9(
147
)
Basement - Remodel

Serving Blacklick, OH and surrounding areas

Approved

Super Service Award Winner

In business since 1989

Free estimates

Emergency services offered

"I recently had my basement remodeled, and I couldn't be happier with the results! The team was incredibly professional, attentive to detail, and truly listened to my vision. They transformed the space into a beautiful and functional area that exceeds my expectations. From start to finish, the process was smooth, and the craftsmanship is outstanding. I highly recommend them to anyone looking to enhance their home. Thank you for making my basement a dream space!"
CEILING TEXTURE
BATHROOM
SHOWER
KITCHEN
KITCHEN

+49

Response time4 days
Response rate96%
Recommended by93%of homeowners
Avatar for Mid-State Basement Systems
Mid-State Basement Systems
5.0(
15
)
Basement - Remodel

Serving Blacklick, OH and surrounding areas

Approved

In business since 1986

Free estimates

Emergency services offered

"Mid-State Basement Systems came highly recommended by a good friend from Buffalo, NY and they did not disappoint. From start to finish they were very professional yet personable. Larry & Phil in the initial stages of the basement inspection and a reasonable quote. Silvino and his team who done the actual work was incredible, done with absolute excellence. They were here when they said they would be and finished the job a day ahead of schedule. I am thoroughly pleased with this company, first class. I highly recommend them if you need work done on your basement.******"
Before
After
Foundation Before
Foundation After
Modernized Basement

+6

Response time2 hrs
Response rate100%
3 neighbors recently requested a quote
Avatar for Buckeye Basements
Buckeye Basements
5.0(
9
)
Basement - Remodel

Serving Blacklick, OH and surrounding areas

Approved

In business since 1997

Customers say: Terrific value

"Jonathan and Leah have been excellent to work with. They have been very responsive to our questions and have completed the work so far as promised with great results. We would highly recommend this company for basement refinishing and would recommend them to family, friends, neighbors and co-workers for basement remodeling."
Custom wet bar
Custom stonework
Custom woodwork
Custom archway
Family room

+16

6 neighbors recently requested a quote
Recommended by77%of homeowners
...
Showing 1-10 of 311
Basement Remodel questions, answered by experts

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Blacklick, OH homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.