Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Windsor, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Windsor, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Windsor

Avatar for SLD Construction LLC
SLD Construction LLC
5.0(
4
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Windsor, NY and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"SLD arrived promptly following the snow storm for proper removal and ice control. Job was done during and after the last snow flake. SLD even visited our site prior to any snow to map out the area for any concerns and where to pile the snow, also marking out Hazards. Very professional team and well prepared."
44' x 40' Pole Barn
44' x 40' Pole Barn
44' x 40' Pole Barn
Snow Removal
Snow Removal

+21

Avatar for Barrows & Sons Septic, LLC
Barrows & Sons Septic, LLC
4.3(
9
)
Concrete Driveways & Floors - Install- For Business

Serving Windsor, NY and surrounding areas

In business since 1959

Free estimates

Credit card accepted

"He was courteous, well informed, completed all work quickly as possible, left no mess behind that had to be cleaned up later. All being said, I would recommend his his service to others. I am very satisfied with the service he performed for me. Tom R. Windsor, NY."
Work
Small deck in Utica
Linda
Linda
Retention pond for state

+9

Response time7 hrs
Recommended by87%of homeowners
Avatar for Stewart Boys
Stewart Boys
5.0(
3
)
Gate for Driveway or Security - Install or ReplaceGravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Windsor, NY and surrounding areas

In business since 2020

Free estimates

Emergency services offered

"Great again, hired them back two weeks after they came do yardwork and land clearing they put up my fence, row my entire property, a chain-link and salt a chain-link gate at the front of the property so people couldn’t use my driveway as a U-turn put an electric gate opener on there and they came out perfect I will be using them in the future and from now on they are my go to company"
Handymen Project
Handymen Project
Handymen Project
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
Avatar for Crawson Logging & Land Clearing
Crawson Logging & Land Clearing
5.0(
3
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Windsor, NY and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"We love the work that this company is doing for us. This company is very reliable and cleans up after themselves. We will definitely be using this company in the near future for other projects that we have planned. Awesome company!!!!!"
Response time1 day
Response rate88%
Recommended by100%of homeowners
...
Showing 1-10 of 55
Asphalt Driveways questions, answered by experts

The three most common types of asphalt are hot asphalt, MC cold mix, and UPM asphalt. Hot asphalt is used most often for paving and patching roadways while it’s hot and workable. MC cold mix asphalt cures more slowly than hot asphalt, but it can be used for temporary patches and repairs in low-traffic areas. UPM is also used cold, but it can be used as a longer-term fix, usable in almost any conditions at almost any temperature.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

If you’re looking for a similar, eco-friendly driveway material, you might consider one of these options:

  • Permeable pavement: This material is sometimes called “pervious” or “porous” pavement; it allows stormwater to drain into the subbase, eliminating storm drain costs. 

  • Gravel: Consider paving your driveway with locally sourced gravel. By sourcing from a nearby source, your money won’t fund international shipping and will be invested back into your local community.

  • Natural stone pavers: Because natural stone pavers are made from organically-produced stone, there’s no new manufacturing required, limiting the environmental impact. In addition, water easily flows and drains through the gaps in the pavers.

Instead of a set number of types, asphalt comes in variations designed for different needs. Some are categorized by temperature—hot mix, warm mix, and cold mix. Others are sorted by composition, like dense-graded, gap-graded (such as Stone Matrix Asphalt), porous, and mastic asphalt. There are also modified versions with added compounds like polymers, rubber, or emulsions. Instead of focusing on a number, it may be more useful to understand how contractors customize asphalt for durability, climate, and traffic conditions.

The Windsor, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.