Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Smithville, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Smithville, NY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Smithville

Avatar for SLD Construction LLC
SLD Construction LLC
5.0(
4
)

Serving Smithville, NY and surrounding areas

Approved

In business since 2024

Free estimates

Offers commercial services

"SLD arrived promptly following the snow storm for proper removal and ice control. Job was done during and after the last snow flake. SLD even visited our site prior to any snow to map out the area for any concerns and where to pile the snow, also marking out Hazards. Very professional team and well prepared."
44' x 40' Pole Barn
44' x 40' Pole Barn
44' x 40' Pole Barn
Snow Removal
Snow Removal

+21

Avatar for WoodRock Construction
WoodRock Construction
5.0(
4
)

Serving Smithville, NY and surrounding areas

Approved

In business since 2024

Free estimates

Credit card accepted

"Matthew was professional, courteous, kept his work space and equipment tidy, and his craftsmanship was outstanding. It was refreshing to find someone that was trustworthy and knowledgeable. In addition to putting in a new sidewalk, he also fixed a crack in my foundation, fixed a sunken downspout, and tree removal. He is an extremely hard worker and cares about the quality of his work. I will gladly hire Matthew for future home improvement projects."
Residential concrete
Residential concrete
Residential concrete
Residential concrete
Residential concrete

+16

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Double M Industries LLC
Double M Industries LLC
5.0(
4
)

Serving Smithville, NY and surrounding areas

Approved

In business since 2019

Free estimates

Credit card accepted

"Double M did a fabulous job with the work we needed including excavation , site work,and a concrete pad. They were professional , knowledgable and had excellent customer service . We would highly recommend them and were very happy with the completed work ."
Driveways
Driveways
Driveways
Avatar for Trump Excavation and Land Clearing
Trump Excavation and Land Clearing
5.0(
1
)

Serving Smithville, NY and surrounding areas

Approved

In business since 2017

Free estimates

Credit card accepted

"Tyler and his crew were very professional and friendly as well as priced extremely fair for the quality and speedy work he did! Cant wait to have him back in the spring to clear some land!"
Response time1 day
9 neighbors recently requested a quote
...
Showing 1-10 of 115
Asphalt Driveways questions, answered by experts

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

The Smithville, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.