Top-rated asphalt driveway pros.

Best asphalt driveway pros near Water Mill, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Water Mill, NY?

Select your specific project to find the pro for you.

TRUSTED BY WATER MILL, NY HOMEOWNERS

  • Average homeowner rating star icon4.1
    Average homeowner rating
  • Verified reviews icon18
    Verified asphalt driveway services reviews

Top-Rated Asphalt driveway pros in Water Mill - Updated Nov 2026

Avatar for Lorenzo Napolitano Construction Inc.
Lorenzo Napolitano Construction Inc.
4.9(
17
)
Concrete Driveways & Floors - Install- For BusinessInterlocking Pavers for Driveways & Floors - Install

Serving Water Mill, NY and surrounding areas

Approved

In business since 1994

Free estimates

Customers say: True professional

"Lorenzo and his team did an excellent job of building a replacement concrete footing wall to support our stairs going down to the water. They did an excellent job under tough conditions. They were both on time and very neat."
Patio
Concrete pool coping
Patio
Patio finished
Patio finished

+72

Response time7 hrs
Response rate86%
2 neighbors recently requested a quote
Avatar for Hampton Kitchen Gardens & Masonry
Hampton Kitchen Gardens & Masonry
4.4(
29
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install+1 more

Serving Water Mill, NY and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"I can't say enough good things about David and his crew. Their work is of the highest quality, their attitudes were fantastic, and I can recommend them completely without any reservations. They even made a suggestion mid-project that required more work - without additional cost - that made the finished project even more stunning. Call them, use them... you will be glad you did!"
Outdoor Oasis...
 Favorite team logo in stone
 Front Stoop & Walkway
 Fire pit inlay
 Bluestone walkway

+59

Response time2 days
2 neighbors recently requested a quote
Recommended by95%of homeowners
...
Showing 1-10 of 381
Asphalt Driveways FAQs, answered by experts

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Building a road on a slope requires careful planning and will normally require a drainage system underneath to prevent flooding and damage to the road over time. Your professional may lengthen your road to create switchbacks if the slope directly to your home is too steep, as there are regulations for maximum road slope. The drainage system will help prevent runoff from the higher side of the slope from damaging the asphalt or concrete. Keep in mind that building a road on a slope isn’t a good DIY project, as a lot can go wrong.

Common alternatives to a gravel driveway include concrete, asphalt, brick, stone pavers, and permeable pavers. Concrete and asphalt are generally the most affordable options. However, concrete can be prone to cracking in cold climates, while asphalt may soften in areas with high heat and direct sun exposure. For enhanced curb appeal, brick, stone, and permeable pavers are popular choices, though their installation can be more expensive due to intricate designs. Stone pavers offer a natural look and are sometimes installed with gravel around them. Both permeable pavers and brick driveways provide excellent drainage, which helps prevent flooding and reduce water runoff.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The Water Mill, NY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.