Top-rated basement remodelers.

Get matched with top basement remodelers in Rushville, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Rushville, NY?

Select your specific project to find the pro for you.

Find Basement remodelers in Rushville

Avatar for D&M Contracting
D&M Contracting
5.0(
6
)
Basement - Remodel

Serving Rushville, NY and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

"I cannot say enough good things about these men! We are very pleased with the bathroom remodel they just did. They went above and beyond to ensure everything was perfect paying attention to details most would not. I will continue to use them for all our future repairs and remodels, and you should also!!!"
project photos
project photos
Project Photos
Project Photos
Project Photos

+44

5 neighbors recently requested a quote
Avatar for R&D Design Studio
R&D Design Studio
5.0(
1
)
Basement - Remodel

Serving Rushville, NY and surrounding areas

Approved

Small jobs welcome

"So happy we chose R&D for our exterior wall repairs! they were great to work with throughout the process of what turned out to be a complicated issue. Their communication was really appreciated as they dug into things and problem solved some unique issues with how the previous home owners had cut corners on the house. R&D wasn’t the cheapest initial bid we received but I have no doubt that we would have wound up paying more in the end for a lower quality result with anyone else. Thanks guys!"
1800's Home Addiction
1800's Home Addiction
1800's Home Addiction
1800's Home Addiction
1800's Home Addiction

+6

Tri-County Remodelers
3.5(
38
)
Basement - Remodel

Serving Rushville, NY and surrounding areas

In business since 1990

Free estimates

"Although a slight problem at the beginning with both ends finding a mutually agreeable time to meet to discuss the project, I felt a good job was done by TriCounty Remodelers. Initial options were asked about and a secondary solution was agreed upon after some more local research was completed. A slight push back was experienced, but that was due to uncooperative weatherfor the initial start of the project. Better options were also offered and accepted in the doing of the project. The project was fully completed in the time alloted. All demolished materials were removed after work was completed each day. I will be having more work performed by these professionals during the next constructuion season in 2010."
Custom Shower, Glass Door
Ithaca Remodel
Hidden Laundry
before
Ceramic Walls

+15

Recommended by92%of homeowners
Avatar for Brock's General Contracting, LLC
Brock's General Contracting, LLC
5.0(
5
)
Basement - Remodel

Serving Rushville, NY and surrounding areas

In business since 1992

Free estimates

Emergency services offered

"We did a split project with Kurt and his team. We had a mother-in-law suite and we wanted to turn it into a full size bedroom with half bath instead since we are expecting our second child. They were recommended to us from a friend and I couldn't have been happier. To start, they were able to beat the price of another contracting group in the area by a pretty decent bit, and on top of that, were willing to do more as well. I demo'd the wall, but they took over after that. They moved all of the wall positions and rebuilt the walls to make the smaller bathroom and bigger bedroom. The drywall job was fantastic. John (or Jon) was the one who handled most of that. He hung the walls and smoothed out the mud. He was absolutely meticulous about it too. I haven't seen a smoother drywall job thus far. Kurt also tiled the bathroom which looks fantastic. Level as can be and the grout-lines are perfect. They installed the toilet (which I actually said I would do) as well as the vanity. When they ran electric through, they set me up with a line attached to a switch for a vanity light in case I wanted one and kept it behind the wall marked and ready for me. There are little details like that that make all the difference in there work, prepping for the future and making sure things will last. They left me a nice access hatch to the ceiling and made a nice molding for it which was an awesome addition for when I need to get up there. We said we would paint the rooms, but they wanted to at least prime them, and I'm very happy they did. They fixed a cracking ceiling and re-painted the whole thing too which is an amazing improvement over before. Overall, we aren't unhappy about a single thing. Kurt has been very responsive after-the-job about just questions on general things and that just shows the work ethics and quality of he and his group. Would I recommend them? Absolutely, without a doubt in my mind. Will I use them again? We already have asked and have two more projects for them later this year. If you have a project, HIRE THESE GUYS!"
1st floor
First Floor Dining area
First Floor/ Living room area
First floor kitchen area
First floor kitchen area

+42

Response time9 hrs
Recommended by100%of homeowners
...
Showing 1-10 of 63
Basement Remodel questions, answered by experts

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The most challenging part of finishing a basement is addressing moisture control. Basement waterproofing is an essential task that requires a professional’s skills and knowledge. If you don’t properly waterproof your finished basement, it’ll be vulnerable to dampness, water damage, and mold growth. Ensuring proper insulation and ventilation to combat these issues while meeting building codes adds complexity to your remodeling project.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

Adding an extension or addition to your home costs more than a loft conversion in all but the rarest cases where the home's structural integrity is lacking. Because a home addition requires a new foundation section or significant structural upgrades to handle a cantilevered portion, the cost compared to almost any loft conversion is significantly greater for the same square footage.

Living in a finished basement is acceptable, but only if the space has the proper points of egress and includes smoke and carbon monoxide (CO) detectors to ensure the safety of the occupants. A good way to ensure your finished basement is suitable for use as living space is to get the basement finishing project properly permitted.

The Rushville, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.