Top-rated subcontractors.

Get matched with top subcontractors in Piffard, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Piffard, NY?

Select your specific project to find the pro for you.

TRUSTED BY PIFFARD, NY HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon178
    Verified subcontracting services reviews

Find Subcontractors in Piffard

A & W General Contractors
5.0(
1
)

Serving Piffard, NY and surrounding areas

Approved

A & W General Contractors is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests, and make their concerns the basis of our business.

4 neighbors recently requested a quote
DAS
New to Angi

Serving Piffard, NY and surrounding areas

Approved

I am someone who is trying to start a business. I’ve been in and around the construction industry for 20+ years, mainly doing commercial residential construction. I want to build something of my own where I feel my work can be noticed. I travel anywhere within the greater Rochester region. I look forward to meeting with you. Thank you

2 neighbors recently requested a quote
Avatar for Dream Work Designs
Dream Work Designs
4.7(
46
)

Serving Piffard, NY and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"This was my second time using dream work designs. The first time they redid our old wood deck and we did trex . This time we did a six foot extension out for our new hot tub. Brian and Karen are phenomenal to work with. I highly recommend them. Worth every penny!!"
Decks and Porches Project
Handymen Project
Remodeling - General Project
Handymen Project
Additional Photos

+79

Recommended by95%of homeowners
Avatar for O'Hare Construction
O'Hare Construction
5.0(
11
)

Serving Piffard, NY and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"knowledgeable, worked within our schedule, accomplished the project in a timely manner. Highly recommend. Panel removed, new panel installed. Lights back on. :)"
Decks
Deck
deck
Deck
Deck

+203

Response time4 hrs
Response rate92%
Recommended by100%of homeowners
Avatar for New Life Painting
New Life Painting
4.9(
42
)

Serving Piffard, NY and surrounding areas

In business since 2020

Free estimates

"Ray and his team did a great job with our interior - it was a huge project including ceilings that were in terrible shape. Very nice and reliable group and I would hire again."
Before
Before
Exterior Painting Job
Before
Before

+19

Recommended by97%of homeowners
...
Showing 1-10 of 57
Subcontractors questions, answered by experts

It usually takes around four to six months to build and install a modular home, although your timeline could go up to around eight months if there are delays in the manufacturing or permitting process. Heavy site preparation and foundation pouring can extend that timeline if you need them, as can customizations you want for your modular home. Your modular home company should be able to provide an estimate for the construction timeline before you sign any contracts or agree to any work.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

There are several different steps in the pole barn building process. First, you’ll need construction plans, which you’ll use to obtain permits. Then, you can clear the land so it’s suitable for building and installing the foundation. Your contractor will frame the barn using large poles, then rough in the plumbing and electricity (if your barn has those elements) before finishing the interior, adding siding, and installing the roof. 

After that, they’ll finish up the electrical work and plumbing and add your windows and doors. You may have a few other finishing jobs to do like painting or waterproofing.

The cost to draw house plans typically ranges from $800 to $2,700, with standard blueprints averaging around $1,800. For a custom home, the cost is higher, with blueprints often falling between $5,000 and $20,000, and potentially more for very complex designs. Several factors influence the total price, including the project's size, the number of rooms, the type of drawings required, and the architect's experience level. You may also need to pay a structural engineer to ensure building safety, particularly for custom homes.

The early stages of building a house are harder than the later stages; laying the foundation and framing the house are two of the most challenging steps. However, it varies for everyone. Some people have difficulty installing HVAC, plumbing, and electricity, while others find it harder to plan the house and secure the necessary permits. 

The Piffard, NY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.