Top-rated bathtub replacement pros.

Best bathtub replacement pros near Hyde Park, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your bathtub replacement project in Hyde Park, NY?

Select your specific project to find the pro for you.

TRUSTED BY HYDE PARK, NY HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon1.5k+
    Verified bathtub replacements reviews

Top-Rated Bathtub replacement pros in Hyde Park - Updated Nov 2026

Avatar for Premier Home Pros, LLC
Premier Home Pros, LLC
4.5(
99
)
Bathroom - RemodelBathtub Install or Replace

Serving Hyde Park, NY and surrounding areas

Approved

In business since 2022

Warranties offered

Credit card accepted

"Had a bathtub taken out and converted to walk in shower unit. The quality seems top notch and installer was great. Installation was over 2-3 days but this was due to a bad snow storm in the area with hazardous roads that caused traffic accidents. The installer went out of his way to do everything he could to expedite it while maintaining a quality install, which I feel he accomplished. Only part I did not like was the hard sell approach of the sales person. Be prepared. Fortunately I had done my research on this company and am comfortable in my decision. Time will tell how well it holds up, but the warranty looks like a good lifetime one. Would definitely use them again."
Beautiful Walk-in Showers
Beautiful Walk-in Showers
Beautiful Walk-in Showers
Beautiful Walk-in Showers
Beautiful Walk-in Showers

+73

78 neighbors recently requested a quote
Recommended by74%of homeowners
Avatar for HR DRYWALL AND HOME IMPROVEMENT INC.
HR DRYWALL AND HOME IMPROVEMENT INC.
5.0(
23
)
Bathroom - RemodelBathroom - Remodel - For BusinessBathtub Install or Replace+1 more

Serving Hyde Park, NY and surrounding areas

Approved

In business since 1999

Free estimates

Warranties offered

"I would hire this company over and over again! Humberto, his son and their guys are amazing! Our bathroom and laundry room had gotten water damage due to a backed up sewer line. Humberto, his son, and their team replaced drywall, baseboards, primed and painted both rooms. They redid the laundry room floors, and the vanity in the bathroom. Everything looks amazing, and we have already discussed with them if they can redo the rest of downstairs, paint upstairs and my kitchen cabinets. They are VERY NEAT workers, always cleaning as they go. They’re reliable, trustworthy and you can tell they aren’t just in it for the money. Humberto is really compassionate."
start
done
tile
marble
Bathroom floor ....before

+9

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Mad City Windows & Baths
Mad City Windows & Baths
4.4(
838
)
Bathroom - RemodelBathtub Install or ReplaceBathtub Liner or Shower Surround - Install or Replace

Serving Hyde Park, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2001

Free estimates

Warranties offered

"We replaced our bathtub with a walk in shower, and are extremely happy with the work that was provided. In only took one person 6 hours to complete the job, and he was very professional and the quality of work was great. Would hire them again."
windows
siding
siding
siding
windows

+20

Response time10 mins
7453 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for D Rohde Home Services
D Rohde Home Services
4.6(
473
)
Bathroom - RemodelBathtub Install or ReplaceBathtub Install or Replace - For Business

Serving Hyde Park, NY and surrounding areas

Approved

In business since 2010

Free estimates

Emergency services offered

"This contractor is outstanding. From the start, they were quick to provide me all information and options available to me to replace my old electric heat at competitive rates. The workers were very efficient, professional, and performed high-quality work; and I am very satisfied with the result."
Mitsubishi Hyper heat (Low Temp) Multi Head Heat Pump
Additional Photos
Mitsubishi Mini Split
Mitsubishi Mini Split
Additional Photos

+22

Response time11 hrs
Response rate100%
36 neighbors recently requested a quote
European Craftsman and Remodeling
4.8(
83
)
Bathroom - RemodelBathroom - Remodel - For BusinessBathtub Install or Replace+1 more

Serving Hyde Park, NY and surrounding areas

Approved

In business since 2009

Free estimates

Emergency services offered

"We used Anton and his team for remodeling our basement and garage after we had water damage. They put up replacement pieces of sheetrock which looked amazing. Absolutely no lines just perfectly level walls. Their workmanship was outstanding. The owner was on site a lot of the time and his team worked very neatly. The painting was simply outstanding. The room looks like brand new. Pricing was extremely fair especially for such quality, high end work. Anton and European Craftsman will be our only call the next time we need work done. Thank you Anton!"
5 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Nu-Line Home Improvements
Nu-Line Home Improvements
5.0(
96
)
Bathroom - Remodel

Serving Hyde Park, NY and surrounding areas

Approved

In business since 2012

Free estimates

Warranties offered

"I was very satisfied with all work done. I had a variety of small home projects, which I was not able to do myself. From caulking windows, cleaning gutters, placing lattice under porch and pool, replacing kitchen sink, installing ceiling fan, etc., Tom was able to do the work and always was professional. I felt that his pricing was fair and he gave me written estimates asked for. The place was always left in clean order. I would highly recommend this company and have already rehired him for another job."
Profile Picture
decks
decks
decks
decks

+14

Response time10 hrs
Response rate100%
3 neighbors recently requested a quote
Avatar for RiteTime Contracting LLC
RiteTime Contracting LLC
4.9(
34
)
Bathtub Install or Replace

Serving Hyde Park, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2024

Free estimates

Small jobs welcome

"Have to say I made the right call. Chris called me immediately and came the same day for service. I had multiple things needed such as installing a AC unit for a sliding window, replacing an exhaust/light fixture in bathroom and some misc other electrical needs. Very professional and courteous. Felt comfortable soon after he arrived. When you call a number blindly you never know what to expect. I couldn’t be happier. With 100 percent confidence if you need some work done big or small, give Chris a call!!"
Backsplash
Bedroom
Den
Response time7 hrs
Response rate99%
31 neighbors recently requested a quote
A-1 Painters/Improvements
4.5(
32
)
Bathroom - Remodel

Serving Hyde Park, NY and surrounding areas

Approved

In business since 1977

Free estimates

Customers say: True professional

"My wife and I were completely amazed by the quality of work, communication and price of A-1's work. Price: I had several people quote the job. The prices ranged from a little under A-1's price to nearly double. The high price was ridiculous, and the person couldnâ t explain why. My house is 20 years old, and every wall needed TLC. Jim, from A-1, understood that half the project was getting the walls and ceiling back into shape. He went through room by room and helped me understand what should be painted (walls, ceiling, and baseboard) and where I could hold off and save money (painting doors â mine were in pretty good shape). He developed a detailed quote and that was the exact price at the end of the job. Communication: Jim texted me several times leading up to the day the job started and then during the process to inform me about the status of the painters. I was never guessing when someone would show up or when the job would be complete. Quality: Wow. Shockingly good!!! There were less expensive painters, but it was clear from talking to Jim that he had many years of experience â as did the team he employed. Before the painters arrived, I told Jim that I needed to cut a 6â hole in the wall to secure some pipes the had broken free. No problem. The lead painter, John, created a patch and 30 mins later, the hole was gone. 60 minutes later, you couldnâ t tell that I had cut a hole. John went on to patch every hole, dent and corner bead that had broken free. My walls looked like they had chicken pox. John went over everything was an expert eye. Jim visited the site several times to ensure the team had everything they needed and that I was satisfied. I canâ t say enough about John, the lead painter. He was exceptional. Great attention to detail, fast, neat and very friendly. Clean-up. The team put cloth down on everything. With all the repairs, the cloth caught wall chips, mud and paint. On the last day, the team pulled these out, vacuumed everything and replaced all the furniture. Great attention to detail!!! I would recommend this contractor to all my friends and family!"
Bath Tile
Cabinet Install
New Kitchen Cabinet install
New Kitchen Cabinet install
New rail and floor

+1

Response time2 days
Recommended by89%of homeowners
JLR Construction
4.8(
18
)
Bathroom - RemodelBathroom - Remodel - For Business

Serving Hyde Park, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2014

Free estimates

Offers commercial services

"Joe and his partner did excellent work. They replaced my deck and railings (with 2 sets of stairs), and my front porch and railings with Trex. Their estimate was fair. Communication was excellent. They showed up on time every day, even when they had to shovel snow around where they were working. They found ways to work around any issues that arose. I love my new deck and porch. Highly recommend them and would definitely hire them again."
Siding prep
Siding finished
Prep work
Finished wall
Front Porch

+8

Response time4 hrs
Response rate89%
1 neighbors recently requested a quote
...
Showing 1-10 of 386
Bathtub Replacement FAQs, answered by experts

A professional bathtub installation or replacement typically takes one to three days, depending on the project's complexity and any necessary alterations. If you hire a professional, most replacements can be completed in one to three days. However, if you choose the DIY route, the process could take up to a month, as it involves removing the old tub and drywall, installing the new tub, repairing the drywall, and installing new tiling.

Roman tubs are very different from ordinary tubs. A Roman tub is typically deeper and broader than a traditional tub, and it's often installed on a custom platform with the faucet positioned on the deck rather than on the wall. Ordinary tubs are more shallow and usually feature built-in shower options. 

Installing a clawfoot tub with a minimum of 6 inches of clearance from surrounding walls allows ample room for the faucet and pipework, makes cleaning easier, and reduces the chance of moisture being trapped between the tub and the walls. It might need to be closer if the faucet comes directly out of the wall.

We don’t recommend using a tub liner to cover up cracks in a bathtub. Instead, you should repair the cracks yourself if you have the experience or hire a pro. Cracks may seem like small surface imperfections, but they can lead to much larger issues, so repair them as soon as you can.

The cost of installing a new bathtub is considerably more expensive than refinishing an existing one, so if you’re looking to upgrade your tub on a budget, you might be better off refinishing it for now. Additionally, if your tub has only minor damage, refinishing it will make it look new again without the extra demolition and time. 

The Hyde Park, NY homeowners’ guide to bathtub replacements

From average costs to expert advice, get all the answers you need to get your job done.