Top-rated basement remodelers.

Get matched with top basement remodelers in Delmar, NY

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Delmar, NY?

Select your specific project to find the pro for you.

TRUSTED BY DELMAR, NY HOMEOWNERS

  • Average homeowner rating star icon4.2
    Average homeowner rating
  • Verified reviews icon28
    Verified basement remodels reviews

Find Basement remodelers in Delmar

Avatar for Elevated Home Improvements, LLC
Elevated Home Improvements, LLC
4.2(
13
)
Basement - Remodel

Serving Delmar, NY and surrounding areas

Approved

In business since 2020

Free estimates

Small jobs welcome

"We needed a wall removed and a finished area in our basement. This crew was responsive diligent and always made us feel comfortable discussing the project. We were very happy with the result"
Response time2 days
Response rate99%
Recommended by72%of homeowners
Avatar for F and D General Home Repairs
F and D General Home Repairs
5.0(
20
)
Basement - Remodel

Serving Delmar, NY and surrounding areas

Approved

Super Service Award Winner

In business since 2023

Free estimates

"Farzad has done a lot of major and minor updates to my home such as installing bathroom fans, light fixtures, venting my microwave outside and installing flooring. He found solutions to my water problem and stopped my garage and basement from flooding when it rains. He does excellent work and shows up on time. I would highly recommend him."
What I Love To Do For You
What I Love To Do For You
What I Love To Do For You
What I Love To Do For You
What I Love To Do For You

+158

Response time2 days
Response rate88%
1 neighbors recently requested a quote
Avatar for MRM Construction Services LLC
MRM Construction Services LLC
5.0(
4
)
Basement - Remodel

Serving Delmar, NY and surrounding areas

Approved

In business since 1998

Free estimates

Warranties offered

"This was our first experience with major renovation/remodeling. MRM made the process nearly pain free working closely with us during the process and accommodating requested adjustments throughout. The team was timely, courteous and skilled. While the majority of subcontractors were great, a select few could improve their service. Without question will work with MRM on projects in the future"
16x16 Addition
12x20 Addition
Room Remodel
Master Bath
Bathroom Remodel

+111

Response time1 day
16 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Gooshaw Construction Services
Gooshaw Construction Services
5.0(
9
)
Basement - Remodel

Serving Delmar, NY and surrounding areas

Approved

In business since 2021

Free estimates

Warranties offered

"We wanted to add a master bathroom to our bedroom I was skeptical mostly of the plumbing due to the location first contractor came appeared confident to do the job within budget then ghosted. Eric responded and met with us reviewed the project scope and budget came back with his partner John devised the plan and they handled everything from there with permits and all materials involved. They were courteous and professional and nd result was great!"
Response time2 days
Response rate89%
Recommended by77%of homeowners
Avatar for KA Construction & Restoration
KA Construction & Restoration
5.0(
3
)
Basement - Remodel

Serving Delmar, NY and surrounding areas

Approved

In business since 2024

Free estimates

Emergency services offered

"Amirah brings expertise and competence to every project. She is professional as well as personable and completes each job efficiently and to specification. She does excellent work."
Whole house interior painting
Exterior Trim on entire home
Whole house interior painting
Whole house interior painting
Whole house interior painting

+12

4 neighbors recently requested a quote
Recommended by66%of homeowners
Avatar for Advanced Energy Adviser's
Advanced Energy Adviser's
4.1(
11
)
Basement - Remodel

Serving Delmar, NY and surrounding areas

Approved

In business since 2014

Free estimates

Warranties offered

"Asked for a quote on removing an old deck, replacing with a larger one. Price quoted was fair, and we accepted. We're very pleased with the final product, and the whole ordeal was hassle-free for me and my wife. Every worker involved was very professional. Communication from start to finish was excellent, and I feel the job was completed faster than we had expected. Will be using this company in the future for other projects."
Response time2 days
Recommended by90%of homeowners
...
Showing 1-10 of 180
Basement Remodel questions, answered by experts

Living in a finished basement is acceptable, but only if the space has the proper points of egress and includes smoke and carbon monoxide (CO) detectors to ensure the safety of the occupants. A good way to ensure your finished basement is suitable for use as living space is to get the basement finishing project properly permitted.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

Renovations that add functionality or more comfortable floor space generally add the most value when remodeling your home. Attic or basement finishing can add floor space without altering the home's structure, saving you renovation money while adding valuable space. Smaller improvements, such as installing smart-home components or replacing entry doors and windows, also experience high ROIs. 

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Delmar, NY homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.