"Amanda was really very good! At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it. It was very clear that she knew her business and she gave me several ideas that I had not even thought about. I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!
"Very friendly, good spirited man. Did a marvelous job with putting up moister barrier, cement boards and tiles. Very respectful towards house an customer.Very satisfied with the work Joey and his partner performed!!"
20+ years experience. Remodeling, welding, decks, anything you need! Passion for creating unique designs and projects for you home. Excited to serve your family and make your project come to light!
While bathrooms and kitchens are nearly equal in terms of renovation difficulty, kitchens are the most challenging. Kitchen design, layout, electrical, and plumbing needs all depend on each other for the success of the entire project, and mistakes early in the project can cause trouble later on.
To determine if your basement walls are suitable for finishing, assess their structural integrity and moisture conditions. Look for any signs of damage, such as cracks, bowing, or excessive moisture. Ensure proper drainage and address any underlying issues before proceeding.
Consult with a professional if you're uncertain about the structural stability or potential risks associated with finishing your basement walls.
Key trends include home gyms, theatre rooms, additional rooms (bedroom/office), and more, with personalized styles reflecting individual preferences.
Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.
Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.
The Tohatchi, NM homeowners’ guide to basement remodels
From average costs to expert advice, get all the answers you need to get your job done.
Hiring a bad basement remodeler can wreak havoc on the look and longevity of your unfinished space. Here are red flags to look for as you vet basement contractors.