Top-rated driveway sealcoating pros.

Best driveway sealcoating pros near Alamogordo, NM

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Alamogordo, NM?

Select your specific project to find the pro for you.

Top-Rated Driveway sealcoating pros in Alamogordo - Updated Nov 2026

Avatar for Road Runner Asphalt
Road Runner Asphalt
4.7(
56
)
Asphalt SealingAsphalt Sealing- For Business

Serving Alamogordo, NM and surrounding areas

In business since 1995

Free estimates

Warranties offered

"Ralph and the Road Runner Asphalt Team did a wonderful job crack filling and then sealcoating our driveway. We were impressed with their services, professionalism and friendliness."
Response time10 hrs
Response rate87%
Recommended by86%of homeowners
Avatar for Sangre De Cristo Paving & Excavating
Sangre De Cristo Paving & Excavating
4.2(
34
)
Asphalt SealingAsphalt Sealing- For Business

Serving Alamogordo, NM and surrounding areas

In business since 1986

Free estimates

Emergency services offered

"Couldn't be happier with the service, timeliness, cost and quality of the job. Mike from Mike & Martin's personally viewed the job site and together we negotiated and agreed on a plan, timeline and cost for the job. Mike's crew arrived on time, followed the plan exactly as discussed and completed the job as promised. The quality of work was exceptional and Mike took the time to make personal contact at the completion of the job and again after a couple of weeks to insure my satisfaction. I would highly recommend Mike & Martin's Asphalt Paving and Sealcoating as a reputable, conscientious, and quality business. I have and will continue to refer M&M to others seeking quality, cost effective asphalt services. They also have an A+ Better Business Bureau rating. Thanks Mike."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+17

Recommended by92%of homeowners
M&S Hauling & Paving
1.0(
1
)
Asphalt SealingAsphalt Sealing- For Business

Serving Alamogordo, NM and surrounding areas

In business since 1985

Free estimates

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

M&S hauling & paving
Chipseal
Chipseal
Response time3 days
Driveway Sealcoating FAQs, answered by experts

A properly applied asphalt driveway sealer, or sealcoat, should last between one and five years. The industry standard is to reseal every two to three years for optimal protection. If you live in a climate with extreme weather, such as heavy rainfall or freezing temperatures, you may need to reseal your driveway more frequently, around every two years. Signs that your driveway needs a new coat of sealant include the appearance of small cracks or uneven drying after rain.

Yes, most services include sealing to protect the finish and enhance durability. Confirm with your provider.

If you don’t want to seal the entire driveway using a squeegee, you can use a roller instead. Rolling the driveway sealer also provides an even, sufficient coating, although it might require more skills to control the speed and pressure. We don’t recommend spraying the driveway sealer because it would cause more splash, hence wasting more material. If anything, you may spray the sealant and go over the surface again with a squeegee to ensure proper coating.

Most sealing projects take 1-2 days, including drying time before allowing traffic.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Alamogordo, NM homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.