Top-rated excavation pros.

Get matched with top excavation pros in Newton, NJ

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Newton, NJ?

Select your specific project to find the pro for you.

TRUSTED BY NEWTON, NJ HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon26
    Verified excavation services reviews

Find Excavation pros in Newton

Avatar for M.L. Plumbing
M.L. Plumbing
5.0(
4
)
Excavation - Major Grading or Resloping

Serving Newton, NJ and surrounding areas

Approved

Free estimates

Credit card accepted

"Had a gas leak in my mechanical room next to my boiler and hot water heater and M.L plumbing came and tested the lines and found the leak and fixed the leaking pipe.Thanks M.L plumbing for job well done and at a very reasonable price👍."
Slockbower Enterprises
5.0(
1
)
Excavation - Major Grading or Resloping - For Business

Serving Newton, NJ and surrounding areas

Approved

In business since 2006

Free estimates

Offers commercial services

We are a locally owned and operated company with 30+ years of lawn care experience. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships with our clients and guarantee your satisfaction!

Response time3 days
Recommended by100%of homeowners
...
Showing 1-10 of 114
Excavating questions, answered by experts

The best type of soil to build on is a mixture of sand and clay, known as loam soil. Loam soil has the best combination of these soil types to build a foundation on. The clay particles help with water retention, so it won’t erode like sandy soil might, and the sandy particles help with drainage, so you won’t see unsafe soil expansion or have an increased risk of leaks from water sitting against your foundation.

Call 811 to locate and mark the gas lines at least three days before digging. In many areas, you can dig within 18 inches of the lines, though in some locations, the distance may be further. Check local regulations, as you may need a utility company representative onsite when digging. Document your calls to 811 and precautions taken to avoid gas lines. A homeowner can be held liable for hitting a gas line in some cases, but contacting the proper authorities and following all guidelines can offer protection.

A perc test can take anywhere from one to eight hours to complete. The total time depends on factors like the amount of excavation required, the depth and width of the holes, and whether multiple test holes are needed. For a single hole, the process of filling it with water and monitoring the drainage rate usually takes less than an hour. Professionals can often complete the entire test in a single day. While it's possible to get results the same day, some companies may take a few days to provide the official report.

Consultation with the local government helps identify necessary permits, avoid project delays or legal issues, and protect project integrity.

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

The Newton, NJ homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.