Top-rated concrete leveling pros.

Get matched with top concrete leveling pros in Spofford, NH

Enter your ZIP and get matched with up to 5 pros

Need a pro for your concrete leveling project in Spofford, NH?

Select your specific project to find the pro for you.

Find Concrete leveling pros in Spofford




EHM

4.50(
16
)

EHM

4.50(
16
)
Customers say: Quality work
71 years of experience

EHM is a structural moving and elevating company that also specializes in foundation repair and replacement. We have been working in the Midwest since the Great Floods of 1993. We specialize in severely comprised foundation issues. We can elevate, level, pier or replace a wall or your entire foundation. We do not do mudjacking, waterproofing or minor crack repair.

"I did not get the service that we originally talked about I am very unhappy"

Donna S on August 2021

EHM is a structural moving and elevating company that also specializes in foundation repair and replacement. We have been working in the Midwest since the Great Floods of 1993. We specialize in severely comprised foundation issues. We can elevate, level, pier or replace a wall or your entire foundation. We do not do mudjacking, waterproofing or minor crack repair.

"I did not get the service that we originally talked about I am very unhappy"

Donna S on August 2021

Concrete Leveling questions, answered by experts

Yes, using water when drilling concrete can help keep dust from clogging the hole and prevent your drill bit from wearing out, although you don’t need to spray water on the concrete while drilling. Water can also lubricate the bit and help keep it cool since drilling into concrete can generate a lot of friction and heat. 

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

Yes, you can drive on concrete after seven days. While doing so, take extra care around the edges of the freshly poured concrete surface, as these areas may not be as strong as the main concrete surface. You should also avoid driving heavy trucks and machinery on new concrete until it’s fully cured, 28 days after it’s poured.

By careful site grading and incorporating drainage systems where needed.

Yes, concrete can set in rain, but it’s best if you pour concrete 4 to 8 hours before any rain to ensure it won’t impact its strength and appearance. Exposure to heavy rain during the early stages (the first 48 hours after pouring) can significantly reduce the structural integrity of the concrete. Over time, cracking is more likely due to softer concrete. 

The Spofford, NH homeowners’ guide to concrete leveling services

From average costs to expert advice, get all the answers you need to get your job done.