Top-rated flooring contractors.

Best flooring contractors near Harwood, ND

Enter your zip and get matched with up to 5 pros

Need a pro for your flooring project in Harwood, ND?

Select your specific project to find the pro for you.

Top-Rated Flooring contractors in Harwood - Updated Nov 2026

Avatar for Skilled Craft Remodeling and Design LLC
Skilled Craft Remodeling and Design LLC
5.0(
8
)
Laminate Wood or Stone Flooring - InstallLuxury Vinyl Flooring - Install - Materials Not Provided by ConsumerLuxury Vinyl Flooring - Install - Materials Provided by Consumer+2 more

Serving Harwood, ND and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"They did a great job with our bathroom design. They were enjoyable to work with and gave helpful advice when needed. We would definitely recommend using them for any flooring job. I wish I had used them when I sanded down my hardwood floors. The work was quality and we have already recommended them friends and family. Micah B."
Hardwood Flooring Sales and Installation Project
LVP Install
Home Gymnasium
Laundry Room
Hardwood Flooring Sales and Installation Project

+17

Recommended by100%of homeowners
...
Showing 1-10 of 84
Flooring Installation FAQs, answered by experts

It takes about one to two days to remove carpet and install laminate flooring for small and medium-sized rooms. A larger room may take an extra day to complete. If you’re replacing flooring throughout your house, expect closer to one to two weeks, depending on your home’s square footage.

Not all attic floors are created equal—size, layout, and square footage often vary. The amount of weight an attic floor can hold depends on several factors including the joist size and position, any structural supports or subfloors, and the original intent of the attic design. Without structural reinforcement, your floor might only be able to support about 10 pounds per square foot of floor load before collapsing.

Raising a sunken living room requires help from a professional contractor. The expert will remove existing flooring and trim, reroute utility lines with respect to the new floor level, pour concrete to fill the recessed space, and then let the concrete cure. After the foundation is raised up, the contractor will install the new utility lines, repaint the walls, if necessary, and finish the area with flooring and trim.

Yes, flooring should go under the fridge and your other large appliances. Installing it underneath creates a seamless appearance and makes it easier to move appliances for cleaning or replacement. It is also essential for protecting your subfloor. A kitchen contractor will help you find suitable flooring that is durable enough to handle the weight of your fridge without denting or cracking.

You can lay your laminate flooring in whichever direction you'd like. However, you should check your materials' instructions and see what the maximum length limit is for the installation. This differs according to the brand you buy, but you can expect it to be around 40 linear feet. Depending on the size of the room, this might dictate which direction you end up laying the planks.

The Harwood, ND homeowners’ guide to flooring services

From average costs to expert advice, get all the answers you need to get your job done.