Top-rated backsplash installation pros.

Get matched with top backsplash installation pros in Hamptonville, NC

Enter your zip and get matched with up to 5 pros

Need a pro for your backsplash installation project in Hamptonville, NC?

Select your specific project to find the pro for you.

TRUSTED BY HAMPTONVILLE, NC HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon55
    Verified backsplash installation services reviews

Find Backsplash installation pros in Hamptonville

Avatar for Silver Line Construction Plus
Silver Line Construction Plus
5.0(
11
)

Serving Hamptonville, NC and surrounding areas

Approved

In business since 2015

Free estimates

Credit card accepted

"Sergii was very professional, flexible, communicated well, and was able to pull off my vision for a black marble fireplace without cracking a single piece of tile. He was also able to see and fix problems from previous renovated areas of the project so that installation would be safe and last. He was very upfront about cost and let me know about the price of materials before starting his work. And he kept his work area very CLEAN!! I was overall very impressed with his expertise, Iâ d recommend him to anyone."
Response time1 day
Recommended by100%of homeowners
Avatar for Wingler's Handyman Services
Wingler's Handyman Services
5.0(
9
)

Serving Hamptonville, NC and surrounding areas

Approved

In business since 2025

Free estimates

Warranties offered

"Insurance company said we had to have rails on both sides of our front porch steps as we only had them on one side due to the way the sidewalks were built. Me Wingler came out quickly installed is two beautiful black handrails!"
Floor/Sliding Glass Door
Floor/Sliding Glass Door
Floor/Sliding Glass Door
Chain Link Fence Repair
Chain Link Fence Repair

+1

Response time4 days
Avatar for C & S Power Washing, LLC
C & S Power Washing, LLC
5.0(
9
)

Serving Hamptonville, NC and surrounding areas

In business since 2010

Free estimates

Emergency services offered

"Jacob did an excellent job. The house is mostly brick. He cleaned the brick and the trim and some painted wood work and vinyl gutters. This work had not been done since we built the house over 30 years ago. The result made it look new again. He had a good crew and they all took care. My biggest concern was accidentally blowing water into the wall cavities and attic. They made sure that didn’t happen. Yes I would and I will hire them again."
Recommended by100%of homeowners
...
Showing 1-10 of 73
Backsplash Installation questions, answered by experts

Yes, it would be best if you waterproofed your shower walls before tiling. The cement backing board behind the tile is not waterproof; it’s only water-resistant. On top of your tile backing board, be sure to use a waterproof shower membrane before you start installing your shower tiles.

No, you don’t technically need a cement backer board for a wall tiling project, but not using it risks disastrous moisture damage. Cement is naturally water-resistant, whereas drywall soaks it in, which can lead to warping or mold growth. Always use a backer board treated with a waterproof membrane for bathrooms and other chronically damp areas to ensure complete tile shower waterproofing.

The best trowel for penny tile is a 3/16-inch-by-5/32-inch V-notch trowel. Because of the small size of the penny tile, you want a trowel with small notches that can lay a thin layer of mortar on the surface you’re tiling. If the notches are too wide, you risk applying too thick of a layer of mortar, and it can squeeze out between the penny tiles.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

It’s best to start with tiling the shower floor before moving on to the walls for the most visually-pleasing results. When taking on any tiling project, you’ll want the wall tiles to “sit” neatly on the floor tiles rather than overlapping them. Finishing your floor tiles first will allow you to place your wall tiles without any gaps, holes, or awkward intersections.

The Hamptonville, NC homeowners’ guide to backsplash installation services

From average costs to expert advice, get all the answers you need to get your job done.