Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Sherman, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Sherman, MS?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Sherman

Niser Polymer Floor Co
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Sherman, MS and surrounding areas

In business since 1993

Free estimates

Credit card accepted

Niser Polymer Floor Co DBA Bo's Best Epoxy Flooring\n\nWe are an experienced crew and are excited to work with you on your project. Reliability and quality are our mission. Epoxy flooring is our expertise, check out all that we offer. I have been in business for over 30 years! Call for an estimate today! \n

Response time6 days
Avatar for The Grass is Greener Landscape Services, LLC
The Grass is Greener Landscape Services, LLC
3.4(
45
)
Concrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Sherman, MS and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"I just needed some shrubs removed and the holes filled in. Todd and his crew got in touch with me one day and did the work the very next day. It was exactly what I wanted. Todd Sorrell is very professional and thoughtful. I highly recommend his services."
Front View
Lawn
Grading
Sod Install
Before and Afters

+13

Response time2 days
Recommended by76%of homeowners
Avatar for H&H Handyman Services
H&H Handyman Services
4.4(
5
)
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Sherman, MS and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Everything went great! I hired them to complete a job that was need done in an hurry, and not only did they complete the job but it was done early! I highly recommend this business for all your home needs! I will be hiring again for my next project."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Recommended by80%of homeowners
StylFlo
New to Angi
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Sherman, MS and surrounding areas

In business since 2016

Free estimates

Credit card accepted

We are a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. We have many years of experience to give you confidence that we are your number one choice for your next home project. You will find us to be competitively priced with close attention to the details. We look forward to building a lasting relationship and guarantee your satisfaction!\n

Showing 1-10 of 33
Epoxy Flooring questions, answered by experts

The best way to resurface a concrete porch is to clean and prep the surface, pour a layer of concrete on top, allow it to cure, then seal it. A concrete overlay provides a durable layer and enhances your porch's look. You can even choose a stamped overlay to make it look like stone or brick. To ensure structural integrity, repair concrete cracks before applying the new concrete. If the existing concrete is in significant disrepair, consider removing and replacing the concrete instead of an overlay.

Installation typically takes 2-5 days, including preparation, pouring, and curing time.

While there is a lot to like when it comes to epoxy flooring, there are some disadvantages for you to consider. For one, this flooring gets very slippery when wet, which means that it might not be the best option for homes with young children and older adults. Using an anti-slip coating can help.

Also, the installation period requires a long curing time of several days. Wet epoxy also releases strong smells during this curing period, which requires proper ventilation and safety gear.

The concrete coating process typically requires anywhere from a few hours to multiple days to complete, depending on the size of the area, environmental conditions, and the specific type of coating being applied. Preparatory work, curing times, and the number of coats needed also influence the overall timeline.

Epoxy and polyurethane sealers can last five to 10 years, while acrylic sealers last two to three years or more depending on the use, wear of the surface, and type of sealer you choose. Areas that see heavy traffic or extreme ice and snow may require more frequent sealing. Test your concrete every two years to gauge how it responds to absorbing water or if it fully repels it for longer than 20 seconds.

The Sherman, MS homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.