Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in New Hope, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in New Hope, MS?

Select your specific project to find the pro for you.

Find Ceramic tile pros in New Hope

Avatar for Nailed It, LLC
Nailed It, LLC
5.0(
6
)

Serving New Hope, MS and surrounding areas

In business since 2019

Free estimates

Credit card accepted

"Mike did a great job! I have been looking for an all around handyman to fix and install things around a property that I own. I'm glad I found Mike. He has already done two jobs for me. He is flexible schedule-wise and very responsive to texts and calls. His prices are not the lowest but they are reasonable. Very friendly and polite to me and my tenants and he can do a lot of different types of work. I highly recommend him as a general contractor/handyman."
Additional Photos
Recommended by100%of homeowners
Avatar for Dearman Construction LLC
Dearman Construction LLC
5.0(
7
)

Serving New Hope, MS and surrounding areas

In business since 2019

Free estimates

"Dearman construction did not disappoint! Very punctual! By far the best customer service and their experience and knowledge of the job requested was outstanding, if you need ANYTHING done from roofing, decking to tile Dearman Construction are the people to go to! Would recommend this business to anyone looking for top notch contractors. Would refer these people to my own family!"
Before picture while poles were going in the ground
New Deck
Stairs
New Deck
New deck

+17

Recommended by100%of homeowners
...
Showing 1-10 of 62
Ceramic Tile questions, answered by experts

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

The number of boxes of tile you need depends entirely on the amount of tile in each box or case. Different manufacturers package their tiles differently, and boxes contain different amounts of tile depending on the size, shape, and material. Often, the amount of area that a case will cover is listed in the product description. To calculate the number of boxes you need, take the total square feet of the space and divide it by the number of square feet the box will cover.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

You cannot tile directly over hot mop waterproofing because tile requires a smooth, solid surface to adhere properly. Additionally, the shower bed pan needs to be raised and sloped toward the drain to prevent water from pooling. However, you can hot mop and apply a sloped mortar bed over the top (to which the tile can then be adhered). 

Yes, your shower pan goes underneath your tiling and helps prevent excess water from seeping into the floor. Without the shower pan under your tile, water will seep through the grout and into the flooring. This will eventually lead to mold growth and serious water damage that could cost thousands of dollars to fix.

The New Hope, MS homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.