Top-rated kitchen and bathroom remodelers.

Best kitchen and bathroom remodelers near Flowood, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your kitchen and bathroom remodel project in Flowood, MS?

Select your specific project to find the pro for you.

Top-Rated Kitchen and bathroom remodelers in Flowood - Updated Nov 2026

Avatar for Cox Construction
Cox Construction
4.7(
7
)
Bathroom - Remodel

Serving Flowood, MS and surrounding areas

Approved

In business since 2008

Free estimates

Warranties offered

"Kitchen turned out beautiful! Work completed in a timely manner. Job was reasonably priced. i would hire cox construction to work on my home for future projects or additions."
Bathroom remodel
Bathroom remodel
Bathroom remodel
Bathroom remodel
Bathroom remodel

+22

Response time1 day
Response rate100%
1 neighbors recently requested a quote
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Bathroom - RemodelBathroom - Remodel - For BusinessKitchen - Remodel+3 more

Serving Flowood, MS and surrounding areas

In business since 2006

Credit card accepted

"They did a good job. She had to submit like a photo but my daughter had them work on the central are of the loft. The deal was for one room. She got a lot of good ideal from her and it was worth it for her. They were professional and I did not hear anything negative."
Recommended by55%of homeowners
...
Showing 1-10 of 141
Kitchen and Bathroom Remodel FAQs, answered by experts

Professionals can enhance bathroom aesthetics by recommending and implementing design elements such as modern fixtures, high-quality tiles, and efficient layouts. They ensure cohesive style, compliment functionality, and an enhanced visual appeal in the space.

Start by gutting the old fixtures and features that need to be removed, such as the tile, vanity, and flooring. You may benefit by removing the toilet, even if you intend to use the same one. Next, install the new shower or tub, followed by the flooring, and then the drywall, which you should then paint. After that, install your new cabinets, vanity, countertop, sink, and faucet, in that order. Replace your light fixture next. Lastly, reconnect the toilet.

The toilet should rest 10, 12, or 14 inches from the back wall. As for other clearances, 15 inches is the minimum distance from the flange to any side wall or nearby fixture, including the shower, tub, and sink. Modern codes also require at least 24 inches of clear space in front of the toilet.

If you plan to make bathroom updates in the near future, try to lump in a few smaller projects with your shower door installation. Most contractors charge a flat rate for smaller projects like updating a fixture. If you lump it in with other projects, you may not have to pay an additional visit fee. Projects to consider doing when you replace your shower door include: Replacing the tile in your shower Updating the showerhead Updating other bathroom fixtures Minor repairs, like fixing small leaks and worn caulk Installing water-safe recessed lighting in your shower

A bathroom addition project takes five to 12 weeks from the design stage to the end of construction, but it varies with the complexity of the project and your goals. Adding a small half bath takes less time than building a luxurious, high-end primary bathroom. It could also take longer if you need to run new electrical and plumbing in the room.

The Flowood, MS homeowners’ guide to kitchen and bathroom remodels

From average costs to expert advice, get all the answers you need to get your job done.