Top-rated land surveyors.

Get matched with top land surveyors in Ackerman, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your land surveying project in Ackerman, MS?

Select your specific project to find the pro for you.

Find Land surveyors in Ackerman

Avatar for Kemp Associates
Kemp Associates
2.0(
1
)
Land Surveyor

Serving Ackerman, MS and surrounding areas

In business since 1968

Free estimates

Offers commercial services

Engineers & Surveyors LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests and make their concerns the basis of our business.\n

Response time2 days
Response rate95%
Land Surveying questions, answered by experts

Yes, new home construction will always require building permits, no matter where you live. In most cases, you’ll need a general construction permit, along with plumbing and electrical permits for the utility lines in your home. Depending on where you live, you’ll likely find that you also need permits for things like connection to a sewage system or installing exterior components, like decks, driveways, patios, and curb cutouts. Leave navigating the permits required for new home construction to a professional to ensure your home is built legally and safely.

A land survey defines and records the physical aspects of a property, including its boundaries, dimensions, easements, features, and sometimes topographical information. In contrast, a land appraisal determines the property's monetary value. While an appraiser will often consult a land survey to understand the property's physical specifications, the survey itself does not determine the land's value.

The small lines on the tape measure either indicate inches, fractions of an inch, or centimeters and millimeters. On the imperial unit side (aka the inches side), the longest lines indicate inches, followed by the next shortest lines that indicate a half-inch, and then the quarter, eighth, and sixteenth-inch. On the metric side, the lines break down meters, centimeters, and millimeters.

If you can’t find any records online, you’ll need to contact your county clerk’s office to do further research. They should have property records on file, or can at least point you in the right direction of who to contact. You can also speak with your neighbors about when their houses were built because they were likely built around the same time.

Depending on property size and complexity, usually 1-3 weeks.

The Ackerman, MS homeowners’ guide to land surveying services

From average costs to expert advice, get all the answers you need to get your job done.