Top-rated basement remodelers.

Get matched with top basement remodelers in Joplin, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Joplin, MO?

Select your specific project to find the pro for you.

Find Basement remodelers in Joplin

Avatar for PMC Construction
PMC Construction
5.0(
12
)
Basement - Remodel

Serving Joplin, MO and surrounding areas

In business since 2019

Free estimates

Emergency services offered

"We have hired PMC twice to do work on our home â the first time was before we sold our first home and the second time was to remodel a bathroom, replace flooring throughout the majority of the house, and to update a bedroom in our new home. They do great, quality work and we are very happy with everything!"
Response time10 mins
Response rate88%
Recommended by90%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Joplin, MO and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for Beau the Builder
Beau the Builder
4.1(
25
)
Basement - Remodel

Serving Joplin, MO and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"We needed new posts for our wood fence. He did not try to upswell us. He showed up when he said he would. He was very professional and did a great job. His quote fit our budget and his workmanship was great. I would call him again if needed and would recommend him to family and friends!"
Before/After contrast.
Northwest Corner
Face of Deck
Top of Deck
Back Corner Facing East

+2

Response time1 day
Recommended by90%of homeowners
...
Showing 1-10 of 66
Basement Remodel questions, answered by experts

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The Joplin, MO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.