Top-rated epoxy flooring pros.

Best epoxy flooring pros near De Soto, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in De Soto, MO?

Select your specific project to find the pro for you.

Top-Rated Epoxy flooring pros in De Soto - Updated Nov 2026

Avatar for Matt's General Home Improvements
Matt's General Home Improvements
5.0(
22
)
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving De Soto, MO and surrounding areas

Approved

In business since 2020

Free estimates

Emergency services offered

"Matt arrived on time and was efficient at replacing floor tiles. Do you think customer service is gone, well so did we until Matt Hemingway came to replace three broken tiles. He finished in 90 minutes and that included going back to hardware store for a different color grout because he didn't like the way it looked. When done you could not tell the floor had been fixed. Excellent job. Highly recommend."
Response time8 hrs
Recommended by85%of homeowners
Avatar for Nunnery’s Landscape and Tree Removal
Nunnery’s Landscape and Tree Removal
New to Angi
Concrete Finishing, Overlays & Coloring - Apply

Serving De Soto, MO and surrounding areas

Approved

Free estimates

We specialize in professional landscaping and concrete services designed to enhance the beauty, function, and value of your property. From custom landscape design and installation to patios, walkways, driveways, and other concrete work, we take pride in delivering durable, high-quality results.

TNT Turnover Services
New to Angi
Concrete Finishing, Overlays & Coloring - Apply

Serving De Soto, MO and surrounding areas

Approved

TNT Turnover Services isn’t just remodeling spaces—we’re transforming them.\n\nWe take outdated, worn, or underperforming areas and turn them into clean, modern, high-impact spaces built to impress and made to last. From kitchens and bathrooms to full property turnovers, our work is driven by precision, quality craftsmanship, and attention to every detail.\n\nAt TNT Turnover Services, we don’t believe in shortcuts—we believe in results. We bring reliability, speed, and professionalism to every project, delivering a smooth, hassle-free experience from start to finish. On time. On budget. Done right.\n\nWhether you’re upgrading your home or preparing a property for its next chapter, we’re here to raise the standard and exceed expectations.

Avatar for Castle Concrete & Hardscapes
Castle Concrete & Hardscapes
4.7(
45
)
Concrete Finishing, Overlays & Coloring - Apply

Serving De Soto, MO and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"Kevin Lewis, owner, visited and saw the cracks. He gave me the same advice as another contractor. The builder poured the entire slab as one piece and as such it's going to crack sooner or later. Repair is not recommended. Replacing the floor when it breaks down is the only true fix. I apprecaite his integrity and honesty."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

Recommended by100%of homeowners
...
Showing 1-10 of 78
Epoxy Flooring FAQs, answered by experts

You’ll usually need to prime a garage floor before painting—especially if the floor is unpainted. Garage floors are made from concrete, which is porous and produces dust. The dust can contaminate the paint and cause issues with adherence. 

Primer creates a barrier and gives you a clean surface to work on. It also minimizes absorption to help give you an even, pro-looking paint job. Make sure you choose a primer that’s specifically designed to cover concrete flooring.

While concrete is durable, it’s also a porous material, meaning that spills can damage the material. Not only does sealing safeguard against this issue, but it can also reduce the risk of mold and mildew.

Installation typically takes 2-5 days, including preparation, pouring, and curing time.

Self-leveling compound usually requires up to 24 hours to dry before you can begin installing tile. It’s best to follow the instructions on the self-leveling product label for appropriate dry time. If you’re still not sure, play it safe and give the self-leveling compound two days to dry before you begin the tiling process.

Evenly wetting a wood floor before applying a stain is called water popping. It raises the grain and opens the wood’s pores to absorb more stain. When done properly, it can make the stain look darker and deeper. However, it’s important to evenly wet the floor and let it dry before applying the stain.

The De Soto, MO homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.