Get matched with top subcontractors in Alma, MO

Alma homeowners rate subcontractors in our network

4.6

(39 reviews)

Top-rated subcontractors.

Need a pro for your subcontracting project in Alma, MO?

Select your specific project to find the pro for you.

Find Subcontractors in Alma

Avatar for LST Builders
LST Builders
New to Angi

Serving Alma, MO and surrounding areas

Approved

Emergency services offered

I am a construction professional with a strong background in both residential and light commercial building, specializing in remodels and new construction projects. My experience covers everything from small interior renovations to full ground-up builds, giving me a well-rounded understanding of the entire construction process from start to finish.\n\nI have successfully completed a wide range of projects, including kitchen and bathroom remodels, full home renovations, additions, and new construction builds. Whether transforming an existing space or starting from the ground up, I take pride in delivering high-quality workmanship with attention to detail and a focus on long-term durability.\n\nMy approach is hands-on and organized. I manage projects by keeping schedules tight, coordinating trades efficiently, and maintaining clear communication with

1 neighbors recently requested a quote
Avatar for Wyatts HVAC & Home Solutions
Wyatts HVAC & Home Solutions
4.5(
23
)

Serving Alma, MO and surrounding areas

In business since 2004

Emergency services offered

Credit card accepted

"Awesome experience with Wyatt’s HVAC and home solutions. My HVAC unit was over 10 years old and not cooling properly David diagnosed the problem and recommended a new 2.5 ton 15 seer unit, the price was very reasonable compared to others folks I got quotes from. He replaced my system within 2 days of me signing up with him. He was timely and very courteous, I recommend his service would not call anyone else for HVAC needs."
Heating & A/C Project
Old Lennox Air Handler
Indoor Mini Split Air Handler for garage installation
Replacement Air Handler by Oxbox for Mr. Talluri
Mr. Hawkins old 3 ton HVAC system.

+21

Recommended by95%of homeowners
Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)

Serving Alma, MO and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)

Serving Alma, MO and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 40
Subcontractors questions, answered by experts

Check reviews, compare quotes, and verify licensing. Ensure the builder has experience with modular construction.

Expect excavation below grade, creating a well for access, weatherproofing, and thorough inspections during setup.

A split-level home is one that has several staggered floors connected by short staircases, while a split floor plan separates the primary bedroom from the rest of the bedrooms. Split floor plans are most often found in single-story homes, while split-level homes are always at least two stories.

The average build timeline for a home is between six and 12 months, with timelines pushing toward the upper end of that range if you’re creating a custom design or need a lot of land preparation before getting started. Hiring a general contractor or a custom homebuilder will help speed up the process, as you’ll see fewer delays between different parts of the build process getting done.

You can draw your own house plans using three-dimensional modeling software, but in most cases, you’ll need an architect to draw up the final plans. Architects understand local building regulations and requirements, so their plans will be necessary for getting permits approved, and they’ll also ensure your home is structurally sound. DIY house plans can be a good place to start to help visualize your project, but you should always defer to a professional before trying to proceed with the project.

The Alma, MO homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.