Solar Panels questions, answered by experts

The best solar-panel mounting system will depend on your property layout, but you’ll typically want to try for south-facing panels to get the most sun. Roof mounting and wall mounting are both popular, but if your well setup is far away from buildings and other structures you can also set up a freestanding aluminum frame to mount your panels.

Ideally, you want to place them facing true south. This is different from what a compass shows, which is called the magnetic south. You can find true south by using an online calculator as long as you know the longitude and latitude of your property. Solar panel placement is key to maximizing the energy you generate, so this is an important step.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

The morning sun can be better for solar panels because it’s often brighter and clearer than the afternoon sun. The brighter the sun, the more energy solar panels produce. The strongest rays occur during midday, which tends to be prime time for solar energy generation. Most homes get a mix of morning and afternoon sunlight.

The actual time it takes to construct the solar farm is relatively short, taking between 2 and 4 months on average. That timeline is dependent on site conditions, crew size, and the overall size of the solar farm.

However, the time it takes to get the ball rolling is significantly longer, ranging from 3 to 5 years. With a project of this scale, you’ll need to obtain all of the proper permits and approvals to start breaking ground, and depending on your location, that could be an extended process.

The Wanamingo, MN homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.