Top-rated asphalt driveway pros.

Best asphalt driveway pros near Eden Valley, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Eden Valley, MN?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Eden Valley - Updated Nov 2026

Avatar for precise landscaping and curbing
precise landscaping and curbing
4.1(
10
)
Interlocking Pavers for Driveways & Floors - Install

Serving Eden Valley, MN and surrounding areas

In business since 2023

Free estimates

Warranties offered

"Jon was outstanding all around. I had a complex sprinkler issue, broken pipe and mismatched fittings. Jon came the very next day and dug out all the piping, and refitted the valves / pipes correctly. He was prompt, polite, professional and overall exceptional. I will be recommending him to my neighbors. And he was very reasonably priced - honest professional."
Response time1 day
Recommended by80%of homeowners
DR Concrete And Construction
4.9(
4
)
Concrete Driveways - Install

Serving Eden Valley, MN and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"I hired Dez and his crew to strip the sealer off my 15 year old stamped concrete. It was a challenging job, but they worked long hours. Dez communicated with me every step of the way and did exactly what he said. Project turned out great and I recommend Dr. Concrete for all projects."
Response time8 hrs
Response rate89%
Recommended by100%of homeowners
Showing 1-10 of 45
Asphalt Driveways FAQs, answered by experts

Overall, a paver driveway is considered the easiest to maintain because homeowners are able to do driveway repair one piece at a time without impacting the rest of the driveway. Unlike paved options, paver driveways contain individual stones that aren't physically connected. By comparison, you may need to reseal or redo a full asphalt driveway if just one portion sustains a significant crack.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

The dimensions of a driveway apron vary based on local building codes, the width of your driveway, and the distance between the driveway and the road. On average, aprons range from 12 to 24 feet wide and 8 to 18 feet long. Typically, the end of the apron connected to the driveway matches its width—such as 10 to 12 feet for a single-car driveway—while the end at the street flares out to allow cars to turn in and out more easily. In some areas, you may not be responsible for the portion of the apron that extends beyond the sidewalk, but this depends on local laws.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The Eden Valley, MN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.