"all work was completed as planned. This crew had the added challenge of hauling all the concrete and limestone mixture up my steep driveway to fill the pumping machine. Having done this type of work before, I know how much additional effort this required. When work was done the crew thoroughly cleaned the work area and driveway. Crew asked for my input on the job before they started cleaning. I was very happy with the professionalism and work ethic of this crew. They would recommend Metro Concrete to anyone who needs concrete raising."
"These guys were great! They were friendly and very knowledgeable about what they were doing. They looked at my steps and didn't exaggerate the problem. I was told what needed to be done and that they were going to drill a few holes to inject the limestone grout, and then did exactly what they said they were going to do. I did call around to get quotes from other companies and was quoted $3000 as a starting point. I paid a fraction of that cost and got my money's worth. If you are ever in need of concrete repair, call these guys! I'm glad I did."
"We were very pleased with the estimating process, quality of the work and the completion our project by Anderson Concrete Lifting. Throughout the process we were treated fairly and with respect. We highly recommend Joe and his crew for your concrete project."
"This is 2nd project I had American waterworks help me with. First was basement wall stabilizing, this one sidewalk leveling. Both crews were well knowledgeable, kind, explained procedures. Very happy with this company!"
"We started in the spring. Greg came out to assess my falling apart garage. He tore down the old garage and replaced it. As it is an attached garage, it was quite a process. Everything went very well. There were some delays due to weather, but that is understandable. Overall, I am thrilled with my new garage and so happy that Greg was also able to redo the sidewalk and steps to my front door. The work is holding up beautifully and Greg and his crews were great to work with."
"Paul and crew came out and assessed the situation and was able to resolve the problem without a problem. The corner of my shop was down about 1.5”. Within no time, my concrete floor was back to it once was.
Thank you Paul!!"
We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction, from the start to the completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.
Rochester Foam It is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers interests and make their concerns the basis of our business.
It’s best not to perform mudjacking in the winter unless the ground temperature remains above freezing. Freezing temperatures can cause the slurry to harden too quickly, compromising its strength and longevity. Concrete is also more susceptible to cracking and splitting in cold temperatures, so there’s a higher risk of damaging the slab during the drilling and lifting process in winter.
Many contractors offer warranties for their work. Confirm terms before starting the project.
The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.
Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.
Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.
Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.
The Arlington, MN homeowners’ guide to concrete leveling services
From average costs to expert advice, get all the answers you need to get your job done.
Learn about concrete leveling and how it can fix uneven surfaces, from sunken sidewalks to uneven driveways, and boost your home’s safety and curb appeal.