Top-rated paving pros.

Get matched with top paving pros in Onaway, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Onaway, MI?

Select your specific project to find the pro for you.

Find Paving pros in Onaway

Avatar for Property Services of Michigan
Property Services of Michigan
5.0(
3
)

Serving Onaway, MI and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"He gave me a quote and did exactly what he said he was going to do. He was clear about to procedure and what he needed to do. It was nice and clean after the service, I didn't have to do any touch ups or clean ups. I was so happy with the results, I hired him to complete resurface my driveway."
Recommended by100%of homeowners
Avatar for Liquid Roofing and Construction
Liquid Roofing and Construction
4.5(
15
)

Serving Onaway, MI and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Liquid Construction did a fantastic job. They were fast, efficient, professional, and an all around pleasure to work with. Their work is the highest quality. We only wish we had found them earlier for other home construction needs (they do much more than roofing)."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+51

Recommended by100%of homeowners
Avatar for Mullett Lake Sealcoating
Mullett Lake Sealcoating
5.0(
2
)

Serving Onaway, MI and surrounding areas

In business since 2015

Free estimates

Small jobs welcome

"Extremely professional and very meticulous about the quality of the application of the seal coating. Would recommend this service to anybody. Pleasure to deal with as well!"
Response time4 days
Recommended by100%of homeowners
Showing 1-10 of 26
Paving Services questions, answered by experts

You can expect your asphalt pavement to last anywhere from 20 to 30 years, or 25 years on average. The life expectancy of your asphalt driveway depends on the climate, the amount of traffic, and how well you maintain it. While you can’t necessarily control some of these factors, you can control the amount of maintenance effort you put into your driveway. 

To prevent your asphalt from deteriorating prematurely, you should follow a good maintenance routine involving regular cleaning, reparation work, and resealing.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

While water-related pressure caused by poor drainage is one common cause of paver cracking, other factors can include ground movement beneath pavers, heavy loads and wear and tear over the pavers, and climates with constant freeze-thaw cycles. In general, pavers should be resealed every three to five years to prevent cracking.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The Onaway, MI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.