Top-rated paving pros.

Get matched with top paving pros in Onaway, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Onaway, MI?

Select your specific project to find the pro for you.

Find Paving pros in Onaway

Avatar for Property Services of Michigan
Property Services of Michigan
5.0(
3
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Onaway, MI and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"He gave me a quote and did exactly what he said he was going to do. He was clear about to procedure and what he needed to do. It was nice and clean after the service, I didn't have to do any touch ups or clean ups. I was so happy with the results, I hired him to complete resurface my driveway."
Recommended by100%of homeowners
Avatar for Liquid Roofing and Construction
Liquid Roofing and Construction
4.5(
15
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Onaway, MI and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Liquid Construction did a fantastic job. They were fast, efficient, professional, and an all around pleasure to work with. Their work is the highest quality. We only wish we had found them earlier for other home construction needs (they do much more than roofing)."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+51

Recommended by100%of homeowners
Showing 1-10 of 26
Paving Services questions, answered by experts

The layer of polymeric sand under the pavers plus the polymeric sand that gets swept into the joints between your pavers holds them in place in a few ways. For one, the gritty texture of the sand helps lock the pavers together. Polymeric sand also contains bonding agents that get activated by water. Polymeric sand will take between 24 and 48 hours to fully cure, so do not walk on your paver walkway before this time.

A driveway's lifespan varies by material. Asphalt driveways typically last 15 to 30 years, while concrete driveways last longer, between 20 and 50 years. The longevity of any driveway is affected by factors like extreme temperatures, heavy traffic, and the quality of maintenance. Regular upkeep, such as filling cracks, resealing the surface, and ensuring proper drainage, can help extend its life. For gravel driveways, regrading to fill in uneven areas every year or two is recommended.

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

The Onaway, MI homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.