Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Mio, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Mio, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Mio

Clark's Parking Lot Maintenance
New to Angi
Asphalt Paving - Repair or PatchAsphalt SealingGravel or Loose Fill Paving - Install, Spread or Scrape+1 more

Serving Mio, MI and surrounding areas

In business since 2006

Free estimates

Credit card accepted

Clark�s Parking Lot Maintenance will handle any parking lot maintenance project you have. We take pride in our work and making our customers very happy. We will do the job right the first time. Give us a call to get the project done to your specifications in a timely matter.

Showing 1-10 of 37
Asphalt Driveways questions, answered by experts

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

Driveway aprons typically range between four and seven inches thick, though your town's building codes will likely have specific requirements. Additionally, you may need to add a layer of permeable aggregate in the excavation below your paved apron to ensure proper stormwater drainage.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is not a type of concrete. While both are a common type of pavement, asphalt is composed of aggregates (like sand and gravel) and bitumen; concrete is a mixture of cement, aggregates, and water. Here are some of the key differences between asphalt and concrete driveways.

The Mio, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.