Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Glennie, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Glennie, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Glennie

DBK'S Concrete, LLC
New to Angi
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Glennie, MI and surrounding areas

Approved

In business since 2022

Free estimates

Credit card accepted

We invite you to experience a tradition of customer satisfaction that will exceed your greatest expectations. Our professionalism and quality workmanship will accurately reflect your taste and lifestyle. From conception to completion we work with you until the job is done. We thrive to take care of all of our clients unique needs. We are ethical, honest and easy to communicate with. Call us today you'll be pleased you did. Thank you

Response time2 days
Avatar for Property Services of Michigan
Property Services of Michigan
5.0(
3
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Glennie, MI and surrounding areas

In business since 2007

Free estimates

Emergency services offered

"He gave me a quote and did exactly what he said he was going to do. He was clear about to procedure and what he needed to do. It was nice and clean after the service, I didn't have to do any touch ups or clean ups. I was so happy with the results, I hired him to complete resurface my driveway."
Recommended by100%of homeowners
PENINSULA PAVERS
4.4(
5
)
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+3 more

Serving Glennie, MI and surrounding areas

In business since 1994

Free estimates

Credit card accepted

"The price was fair. When they originally came to do it, there was not enough road gravel down so we had to have the other guy come back and redo that. We kept getting a promise date and then they wouldn't show. It took a while to get them back so we were a little disappointed with them. We couldn't reach them. We would leave messages and they wouldn't call back. Since we missed our first opportunity, then we got pushed back and they took care of the other places. They should have responded and let us know. When they finally did come the crew was great and the finished product was good. The pricing was in the ballpark. This was set up through our contractor. They did finally come when they said but it took 3 times. We might look for somebody else in the future."
Recommended by75%of homeowners
Showing 1-10 of 30
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Think of the street as a way to capture all the elements on either side of the road, including the road—a street encompasses the homes or other buildings, the trees, and the road of a given area as defined by the beginning and end of the street on a map. A roadway, however, is the component of the street where cars travel.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

Yes, using recycled asphalt millings is an eco-friendly alternative compared to concrete. Millings are reclaimed pieces of gravel that are recycled into aggregate that can be used on driveways, patios, walkways, basketball courts, tennis courts, and more.

The Glennie, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.