Top-rated concrete wall service pros.

Get matched with top concrete wall service pros in Levering, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete wall construction project in Levering, MI?

Select your specific project to find the pro for you.

TRUSTED BY LEVERING, MI HOMEOWNERS

  • Average homeowner rating star icon4.8
    Average homeowner rating
  • Verified reviews icon12
    Verified concrete wall construction reviews

Find Concrete wall service pros in Levering

Avatar for Groundworks
Groundworks
5.0(
33
)
Poured Concrete Wall - Repair

Serving Levering, MI and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 2007

Free estimates

Warranties offered

"John and Miles were excellent workers. They were very polite and professional. The job they did supporting my sagging basement wall looks like it should take care of the problem. They placed steel plates against the basement wall, and also buried other ones out in the yard, and connected them with steel rods. Then they torqued them, which should prevent any further sagging of the wall."
Basement
Basement
Basement
Basement
Concrete

+16

179 neighbors recently requested a quote
Recommended by83%of homeowners
Concrete Walls questions, answered by experts

Newly poured concrete is prone to small, fine cracks within the first 30 days of installation, but most noticeable cracks will disappear within that time frame. If a crack is greater than 1 inch, consider contacting the person who installed your wall to inspect the job.  

Most of the time, you or your contractor will spray the concrete form and framework with a release agent or oil to prevent sticking. This is common practice with wood and steel forms. For insulated concrete forms, the styrofoam formwork often remains in place after construction, so you don’t need to treat it beforehand. Foam concrete forms made out of melamine also may not need treatment beforehand, as the material naturally won’t stick to the concrete after it’s cured.

With proper installation and sealing, both poured concrete and cinder block walls can be durable options for your yard or home. Poured concrete walls do offer more durability and strength, but cinder block walls are less expensive to build and DIY. A concrete wall costs an average of $6,500.

Aim for a concrete thickness of at least 4 inches for the walls of your above-ground storm shelter and 3.0 to 3.5 cubic yards of concrete for the base of your storm shelter. If you’re concerned about the thickness of your concrete while building a storm shelter, get in touch with a professional storm shelter builder to make sure your work is up to code and safe. 

Concrete houses cost 10% to 20% more to build than stick-built homes, and maintenance on home systems is more invasive and expensive due to pipes and wires being buried in concrete. Concrete homes can also look more industrial and less comfortable if you don’t cover the concrete with finishing materials. It’s also more challenging to make changes to concrete, so reframing doors and windows or building home additions will cost more. Concrete needs time to cure, too, so the timeline to build a house out of concrete is a bit longer.

The Levering, MI homeowners’ guide to concrete wall construction

From average costs to expert advice, get all the answers you need to get your job done.