Top-rated pole barn builders.

Get matched with top pole barn builders in Lakeside, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Lakeside, MI?

Select your specific project to find the pro for you.

Find Pole barn builders in Lakeside

Avatar for O'Kerns Construction
O'Kerns Construction
5.0(
2
)

Serving Lakeside, MI and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"The worked performed was excellent. No corners were cut and materials used were all quality items. I would hire O’Kerns anytime there was a project I needed done."
tub tile remodel
Barn door install
New tile install
Garage door repair
Exterior wood rot repair

+6

Response time1 day
2 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for R Bowen Construction, Inc.
R Bowen Construction, Inc.
4.7(
56
)

Serving Lakeside, MI and surrounding areas

In business since 2014

Free estimates

Emergency services offered

"I Needed to setup a drill press in my basement. I recently had back surgery and wasn't able to do it myself. So I went online to Angie aka Angie's List. Bowen Construction reached out immediately and offered a great price. So it was a no Brainer to choose Bowen Construction. When Rick Bowen showed up, he easily assembled drill press and made adjustments to get it running smoothly. Thanks to Rick’s attention to detail, right before leaving he was studying the picture he took of drill press and noticed that it wasn't level. So he came back and fixed it. I love my new drill press. I would recommend Bowen Construction to anyone who needs a handyman. Thank you."
Mobile home skirting
Deck Repair and painted
Gazebo and lawn furniture assembly
Deck staining
Storm Door put up

+82

Response time8 hrs
Recommended by70%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Lakeside, MI and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for MPO Builders Inc
MPO Builders Inc
4.0(
145
)

Serving Lakeside, MI and surrounding areas

Free estimates

Credit card accepted

"Mike and his crew redid both of our bathrooms with heated floors and all the works.  The project was a little bit challenging in that we did one wall with pebbles which was very labor intensive.  Still, they did a great job.  My wife now says we have a better bathroom than the spas / hotels.
"
Recommended by85%of homeowners
Avatar for DNA Residential Restoration
DNA Residential Restoration
4.6(
20
)

Serving Lakeside, MI and surrounding areas

In business since 2016

"Since my previous review of DNA I've kept employing Derek Esterline and his associates over and over again, as there's no end of things that need to be repaired/updated/replaced, etc, after thirty-some years of "deferred maintenance." Derek has recently taken on a new partner, John Wright, and I wanted to update my review with a note about how expertly he has fit into the business. John is conscientious, industrious, and a very quick study who appreciates the high levels of skill and experience Derek has to impart. Recently they've given my barn a complete makeover, replacing shoddy roofing, broken windows, siding and hardware as necessary, and power-washing and painting the exterior and trim so that it now looks like something you might find in Martha Stewart's back pasture. They've cleaned up severe storm damage, carefully taking down a huge maple limb that had been weakened and left hanging perilously over the road by gale-force winds. In addition, John's in charge of the bookkeeping chores, cheerfully and diligently dealing with all the paperwork. That he's also an extraordinarily kind person is not necessarily relevant to a review like this, but to the extent that it speaks to a person's character I'll throw that in as well. (I've been so touched by the way he makes sure my very old, blind, dog gets his share of attention and doggie treats.) As far as I'm concerned, Derek and John are the Hallmark Cards of the repair business--for "when you care enough to hire the very best.""
Recommended by100%of homeowners
Avatar for MCG Modern Construction Guy
MCG Modern Construction Guy
4.5(
11
)

Serving Lakeside, MI and surrounding areas

In business since 2021

Free estimates

Emergency services offered

"MCG Modern Construction Guy is a reliable and excellent service company. The owner, Gerardo Coria, Jr. Is a precise, punctual, and detail-oriented person, especially honest, authentic and informative. He has done a great job for me and I highly recommend this business. Theresa Wiggins"
Before
Windows& doors
Deck steps
Handymen Project
Handyman Services Project

+102

Response time7 hrs
Response rate100%
Recommended by100%of homeowners
Showing 1-10 of 44
Pole Barn Builders questions, answered by experts

Whether pole barn posts should be set in concrete depends on the soil surrounding your home. If your soil is compact and digging conditions are agreeable, then setting pole barn posts in concrete is an ideal option.

American badgers sleep in the burrows they dig, which can be extensive, featuring multiple chambers and tunnels. Badgers prefer to excavate their dens in open grasslands, prairies, and fields where the soil is easy to dig. They are solitary animals and usually have several burrows within their territory to use as needed. These underground homes provide them with a safe and secure place to rest during the day and to raise their young.

Skid foundations, deck block foundations, and concrete block foundations are the most affordable shed foundation options. Of these, we recommend deck blocks. Deck blocks are easy to install and level, and they raise your shed up off the ground to prevent rotting from exposure to water and moisture. Keep in mind that deck blocks won’t resist soil movement or frost heave, so they’re not ideal in areas with expansive soil or a deep frost line.

Yes, you can use a storage shed several ways, including as a chicken coop, but you'll need to make some modifications. You will have to add a chicken door, roosts, ventilation near the roof, mesh on the windows, and insulation if you live in a colder climate. Additionally, you’ll want to ensure that the shed is predator-proof so no other animals can harm your chickens. You should also add a run and nest boxes to your shed.

Technically, most states allow tiny homes, but it depends on the definition of tiny and whether the structure is permanent. Zoning laws regarding home size and construction are significant factors. For instance, a tiny home may be legal as a recreational vehicle in most areas, but you may only install it on a property if it complies with building and zoning codes.

The Lakeside, MI homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.