Top-rated basement remodelers.

Best basement remodelers near Berkley, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Berkley, MI?

Select your specific project to find the pro for you.

TRUSTED BY BERKLEY, MI HOMEOWNERS

  • Average homeowner rating star icon4.3
    Average homeowner rating
  • Verified reviews icon102
    Verified basement remodels reviews

Top-Rated Basement remodelers in Berkley - Updated Nov 2026

Avatar for Done Rite the First Time
Done Rite the First Time
4.8(
111
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

In business since 2013

Free estimates

Warranties offered

"Three stars because the work is very nice, but I am disappointed in the overall experience. Larry came to quote cleaning and sealing our deck and confidently told me it would require 6-7 gallons of stain. He told me to get a Behr semi-transparent stain - no mention of having it tinted. (I've never owned a deck; it did not occur to me that it needed to be tinted.) It would have been helpful to know this, even if it seems obvious to other people. He arrived right on time to begin work, but when he realized the stain wasn't tinted, I had to take it back to the store and have it tinted. (His exact instructions: Take it back and have it tinted, OR return it and buy one that is already tinted.) I get home with my 7 gallons of tinted stain, and then it doesn't work in his sprayer, and I feel a little bit like he is blaming the brand - which he told me to choose. Finally the work is done...and he only needed HALF of the stain. So I am stuck with about $150 worth of stain that I don't need. He told me "it may last a year in the basement" and then when he saw how not happy I was, he said it would "definitely last a year" and can be used for touch-up later. Then he told me that's why he always tells people to get already tinted stain, so they can return the leftovers. Well - not really, otherwise I would have done that and would be returning my leftovers today. So, good work, timely arrival, and I appreciated that he came out to do the estimate in the evening. That was very convenient. But the overall experience has bummed me out and taken some of the pleasure away from my beautifully stained deck. I was hoping this could be the start of an ongoing relationship, as we have a lot of projects and he does almost everything, but I don't think I would hire him again."
Logo
New Bathroom
New Bathroom
New Basement
New Basement

+9

Response time12 hrs
Response rate100%
4 neighbors recently requested a quote
Avatar for Finished Basements Plus
Finished Basements Plus
4.6(
70
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

In business since 2003

Free estimates

Warranties offered

"All I needed was half my basement repaired from water damage due to a broken pipe. They would not come out to even quote the job unless they were going to rebuild the entire basement. At least they didn't waste my time."
Ceiling Detail
Open Rail Staircase
Custom Kids Play Space
Main Area
Open Concept Floorplan

+193

Response time12 hrs
Recommended by68%of homeowners
Avatar for Diamond Developments, LLC
Diamond Developments, LLC
5.0(
14
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

In business since 2020

Free estimates

Warranties offered

"My wife and I hired Diamond Developments (DD) to completely remodel our master bathroom shower. Remodel consisted of tearing out the old tile, fixtures, and substructure and replacing them with new Prior to the work, we had the custom glass shower doors and partitions removed by our local glass company that installed them many years ago. We wanted to use the same glass for this current project. DD assigned Justin and Anthony to our remodel. From day 1, they were always on time and ready to work. Floors and stairs leading up to the work area were covered with heavy-duty paper and plastic for protection. At the end of the work day, the work areas were cleaned and organized for the next. They were helpful and would give a daily summary of work completed and what the next dayâ s work plan was. We never had to guess. The tile remodel was all subway tile with custom inlays and niches. The work was beautifully and precisely performed by Justin and Anthony. Our glass guy was called back when the project was done. and was able to use ALL the old glass He remarked that this never happens and was totally impressed as were we at the work completed by DD. Our new master bath shower project was completed beyond our expectations and performed by quality, conscientious, professionals. My wife and I are very happy with Paul and his team from Diamond Developments and will use them again for future projects. Thank you!"
Natural Knotty Pine Open Floor Plan
Basement Speakeasy
BEFORE, basic 80's kitchen with soffits
Golf Course Gorgeous
Whole House Remodel

+87

Response time2 days
Response rate93%
9 neighbors recently requested a quote
Avatar for XP Construction, LLC
XP Construction, LLC
4.7(
17
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

In business since 2015

Free estimates

Customers say: Quick response

"We selected this company to finish our basement because the quote was way lower than the other big companies and talking with Xhulio about the project, it just felt like a good fit. And it was! He was very kind, patient, and accomidating to any and all ideas and concerns. The process was smooth, they catered to all our needs and the results are amazing!! We had our own design plan and he and his dad, Jimmy followed them to a "T". They produce quality work, but very quickly. Very detailed and clean up after themselves each day. They let us paint our own cabinets for a full kitchen and seperate bar, and they installed them for us. They felt like family to us. My husband and I definitely recommend them and have referred them to others already! Great value!!"
Kitchen after
After
After
kitchen
bath

+85

Response time20 mins
Recommended by90%of homeowners
Avatar for Exquisite Touch
Exquisite Touch
4.6(
34
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2020

Free estimates

Warranties offered

"They showed up on time , were very respectful of my property, very knowledgeable of the plumbing repairs needed ( toilet in basement & utility sink faucet ) . Fast and efficient estimate. Along with labor and materials were very reasonably priced."
Remodeling - Kitchen & Bathroom Project
Bathroom remodel
Remodel
Handymen Project
Remodeling - Kitchen & Bathroom Project

+26

Response time8 hrs
Response rate89%
21 neighbors recently requested a quote
Avatar for US-TECH INC. BUILDERS
US-TECH INC. BUILDERS
4.9(
33
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

Super Service Award Winner

Free estimates

Emergency services offered

Warranties offered

"Frank and his team did great quality work on our basement! Frank took care of the hiccups expeditiously and he and his team made us feel well taken care of. Frank's input with design and ideas were very helpful too! We are extremely pleased with our basement and will definitely hire them again for future jobs. Thank you for exceptional service!!"
Remodeling - General Project
Remodeling - General Project
Winchester Dormer Build
General Remodeling Project
General Remodeling Project

+114

Response time1 day
1 neighbors recently requested a quote
Recommended by93%of homeowners
Avatar for Superior Home Building LLC
Superior Home Building LLC
4.2(
35
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Emergency services offered

"Best decision I have EVER made hands down was choosing SHB. I called multiple companies prior and never felt confident in going through with my remodel until I met Jerrod. He was honest, professional, friendly and consistent, along with his whole team. I know if I need anything done in the future I will call him first without hesitation."
Basement Golf Room Simulator
Basement Golf Room Simulator
Basement Golf Room Simulator
Basement Golf Room Simulator
Basement Golf Room Simulator

+31

Response time1 day
Response rate100%
5 neighbors recently requested a quote
Avatar for Itqan Building and Remodeling LLC
Itqan Building and Remodeling LLC
4.9(
24
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"Lessor Haven has assisted my family with multiple projects! More recently were these lovely handrails. I can always expect a prompt and delightful response. Thank you very much!"
Response time7 hrs
Response rate100%
3 neighbors recently requested a quote
Avatar for GMC Painting LLC
GMC Painting LLC
5.0(
5
)
Basement - Remodel

Serving Berkley, MI and surrounding areas

Approved

In business since 1988

Free estimates

Warranties offered

"We had GMC scrape, caulk & paint the outside of our house, plus windows for a reasonable price. They showed up on time, we’re nice, pleasant & thorough. Work was very well done& they finished in a timely manner. We highly recommend GMC & will use them again for interior painting."
Response time1 day
6 neighbors recently requested a quote
Recommended by100%of homeowners
...
Showing 1-10 of 192
Basement Remodel FAQs, answered by experts

Yes, in most cases, finishing a basement is worth the cost. The project adds valuable, usable square footage to your home and typically provides a return on investment (ROI) of 70% to 75%. For example, an average basement refinishing project costing $32,000 could add between $22,400 and $24,000 to your property's value. The final value added depends on factors like your location, the quality of materials and workmanship, and the features you include, such as a living space, bedroom, or bathroom. To be officially counted in your home's total square footage, the finished space must comply with all local building codes, including requirements for points of egress. However, in areas prone to flooding, a finished basement might be seen as a liability by potential buyers and could potentially decrease your home's value.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

The Berkley, MI homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.