"Top Remodeling worked wonders on our basement, creating a versatile space that's now an entertainment hub. The transformation is remarkable—impressive design, quality materials, and efficient use of space."
"Our kitchen remodel by Top Remodeling was a fantastic experience. Ben's creativity in the design phase made a significant difference. We love our new kitchen!"
"Received exceptional service by Ronal and his team. Not only was the work done well, he was very attentive and conscientious about ensuring the tile design was the way I wanted it. Every day his team also left the work area very clean so I could use portions of the space even while the work was being done. Highly recommend!"
"S&J was hired to remodel, adding two closets and paint main level after removing plantation blinds. They were on time every time, the jobs were completed in the timeframe they gave me, and it turned out beautifully. I highly recommend them."
"DMV was the first of 6 contractors that I had spoken with to completely remodel my kitchen. They were prompt, to the point, and quick to give a design and a quote. I liked their input and ideas, but surfed around for another month, worked with an architect and several other designers, and evetually came back to what DMV had designed from the beginning. (Wish I had skipped the pricey architect!) They gave good advice on things that seemed so simple (cabinet pulls) but were overwhelming when you looked at all of the possible options. The job only took 18 days (though the space was "easy" since my basement is unfinished and they had easy access to move pipes, wiring and ducts. My electric panel also had a lot of space in it and did not require any crazy upgrade.) The only minor delays were my fault as I took some time mulling over a few things. My neighbors commented that the workers were extremely courteous, clean, and quiet and did not disturb them throughout the project. My kitchen renovation did not change the footprint, however, I did move an extrerior door and changed the size and placement of a new window. The project was completed a month ahead of schedule and on budget. Everything was kept clean while in process and I was really not inconvenienced by not haing a workable kitchen very much at all. Javier, Lucas, Alex and John were great at communicating and they were on time or early every day. I highly recommend them."
"Great company! Design consultant was very informative and I really appreciate their attention to detail throughout the process. I love my new beautiful shower. I am very happy that I went with Renken Remodeling."
"No remodel project goes perfectly but this one came darn close. Our designer, Fatih worked closely with us to come up with the perfect design and materials for our space. I loved the 3D image he provided so that we could fully envision the finished product. I also appreciated that there were no hidden costs. VKB fully disclosed the cost of every item/material. The project manager, Adam walked through the project on the first day and stayed in contact with us (day/evening) to ensure our satisfaction. The CREW, led by Walker was AMAZING!!! I can't say enough about the tile work. The young man spent days in our home working on the floor and shower and it came out beautifully. The other crew members produced similar quality work. The only negative is that sometimes the garbage from the job stayed in our driveway a little longer than we would have liked but, it was a small price to pay for such a beautiful bathroom Can't wait to use VKB again for our hall bath which we hope to start in the fall. Wonderful experience!"
"I can't thank Randy the owner and his crew enough for the wonderful job they did on my bathroom remodel. Randy is so helpful with suggestions and taking feedback and what works well and what doesn't. He's made my life a little better and easier. I would definitely use them for future projects."
"We are thrilled beyond measure with our new kitchen. Kitchen Saver did it all: Refaced our 25-year old cabinets, installed 3 new cabinets, installed a new apron sink with hot water dispenser and "touchless" faucet, and handled installation of our new granite countertops. The entire team - our designer Mahsa, our measurer Bernie, our installer Jae, and the office support from Melissa and Courtney - were extremely professional and responsive to our every need. Jae in particular was an absolute perfectionist, taking care of every last detail and offering problem-solving solutions as we went along. We'd give more stars if we could! We highly recommend Kitchen Savers. It's the way to go!"
"The bathroom remodel went very smoothly and we are very happy with the results. Our tech, Abdias V., was easy to work with and really knew his business."
Drawing your own floor plans is acceptable for many kinds of projects, including interior design and room layout. You can use floor plan software to create the plans but keep in mind that the floor plan will only be as accurate as the measurements you take and enter into the software.
There are several different steps in the pole barn building process. First, you’ll need construction plans, which you’ll use to obtain permits. Then, you can clear the land so it’s suitable for building and installing the foundation. Your contractor will frame the barn using large poles, then rough in the plumbing and electricity (if your barn has those elements) before finishing the interior, adding siding, and installing the roof.
After that, they’ll finish up the electrical work and plumbing and add your windows and doors. You may have a few other finishing jobs to do like painting or waterproofing.
Italianate architecture is a reinterpretation of Renaissance styles, combining elements of Italian farmhouses and villas with Victorian materials and construction. This home style emerged in the Victorian era, gaining popularity in the U.S. in the mid-to late-1800s. The style came about in response to what many then viewed as the too-rigid and stuffy Classical style designs.
While it’s never too early to start planning for a major home improvement project like a home addition, give yourself at least a month or two to plan and design your addition, find a contractor, and get the permits in order. For larger projects like a second-story addition that require designing with an architect, plan on three to four months of preparation.
In-law suite floor plans almost always include at least one bedroom, a bathroom, and a combination kitchen/living room area or separate spaces for the kitchen and living room. Larger in-law suites built in accessory dwelling units separate from your main structure can feature multiple bedrooms, dining rooms, and entertainment rooms in addition to the necessities.
The Savage, MD homeowners’ guide to remodel design services
From average costs to expert advice, get all the answers you need to get your job done.
Remodeling your bathroom can add significant value to your home. Your bathroom remodel cost in Baltimore, MD will depend on size, fixtures, materials, labor, and other factors.
Home remodeling doesn’t have to follow the norm. Think outside the box. Find out unusual and unique home remodeling additions to inspire your next project.
Living room renovation transforms your home. Find inspiration with these top living room remodel ideas, from adding an accent wall to installing crown molding.