Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Garyville, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Garyville, LA?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Garyville

Avatar for Precision Paving and Sealcoating
Precision Paving and Sealcoating
4.4(
35
)
Asphalt Paving - Install- For BusinessAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Garyville, LA and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Josh came out and sealcoated my driveway, I had a large driveway that was surrounded by concrete and he did not get any sealer on the concrete I am very happy, Josh is also a very kind person to do business with. Highly recommended."
Response time2 days
Response rate89%
Recommended by84%of homeowners
...
Showing 1-10 of 186
Asphalt Driveways questions, answered by experts

It’s best to weigh the pros and cons of each material and decide on your priorities for your driveway. Gravel won’t be an appropriate choice if your driveway experiences heavy traffic. You’ll find that you need to level and top it off regularly, which could make the material a much more expensive option.

Cobblestone is just one of many driveway materials. Other, more economical, albeit less elaborate options include concrete, asphalt, and gravel. 

If you want a material that most closely resembles cobblestone, your best option is bricks or pavers. Both cost anywhere from $10 to $50 per square foot and can be laid in all kinds of patterns. Depending on the type of paver you choose, you can also get a good bang for your buck by investing in durable natural stone.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

Asphalt driveways last anywhere from 15 to 30 years, but if you don’t stay on top of repairs, you may find yourself spending extra to replace your driveway before its typical lifespan. Stay on top of repairing cracks and potholes by routinely inspecting your driveway once or twice a year. It’s a good idea to pressure wash your asphalt driveway at least once a year to keep it clean. Apply a sealer every one to five years, based on your climate.

Your driveway contractor will probably recommend that you avoid driving on your new millings driveway for up to a week. Keeping pressure off the freshy applied millings will help the driveway to bind together. While the sun is helpful for binding millings, hotter weather can actually make the curing process take longer.

The Garyville, LA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.