Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Cloverport, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Cloverport, KY?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Cloverport

Avatar for Phillips Waterproofing
Phillips Waterproofing
3.8(
17
)
Concrete Driveways - Install

Serving Cloverport, KY and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"I've read reviews from other people, and it's interesting how people can have different experiences. I had a 26X65 concrete slab put in, and culvert put in along with some grading done. Kevin came when he said he would and did what he said he would do. I guess my experience overall was one that hit a lot of different angles. The work done was great, but there were some misunderstandings that was of no fault of Kevin's, but I made them his. One of which was no fault of mine, either, but the company led me down the wrong path painting the picture that what Kevin was supposed to do didn't. As I was out of town, I called him up and voiced my displeasure. He responded very professionally and explained the situation to make me understand that he did do what was asked of him. A couple other times, a text went awry and something else that I have since forgotten. But each time he handled himself professionally and had no attitude despite being falsely accused. I'm sorry to hear of other people's situation, but I can only speak for myself and what I experienced. The other thing that impressed me was Kevin was willing to haul his equipment, and did, from a few hours away to regrade an area that this company said they couldn't get across, which was the companies miscommunication. The other thing is response time. There was one time it took a while for him to respond, but living in a rural area, and given that if you're in the middle of a job, I can't expect someone to always be available. One time we even lost connection due to how things are. Just something to keep in mind if you live in an area with ONE bar : /"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+31

18 neighbors recently requested a quote
Recommended by84%of homeowners
...
Showing 1-10 of 68
Asphalt Driveways questions, answered by experts

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The driveway apron is a technical term referring to where a private driveway meets the public street. If there is a sidewalk in front of the house, the driveway apron is typically on the opposite side of the public sidewalk from the driveway itself.

The decision to repair or replace your driveway depends on the extent of the damage. If your driveway has a few small cracks, a simple repair will do the trick. If you see larger cracks and potholes, it may be time to consider resurfacing or replacement. Resurfacing is a great option if more than 25% of the surface is damaged, but if the damage is extensive—deep cracks or significant sinking—it’s best to replace the driveway entirely. A new driveway, with proper care, can last decades while patching or resurfacing might only hold up for a few years before needing more attention.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Cloverport, KY homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.