Top-rated basement remodelers.

Get matched with top basement remodelers in Leon, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Leon, KS?

Select your specific project to find the pro for you.

Find Basement remodelers in Leon

Avatar for Johnson Remodel LLC
Johnson Remodel LLC
4.8(
36
)

Serving Leon, KS and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"Brian raised our deck and repaired the stairs 2 years ago due to setting issues. The past 2 days he replaced rotted post, repaired railings and rebuilt the landing at the top of the stairs. Very professional and outstanding quality of work. I highly recommend Brian for any repairs"
Bathroom Home Remodeling
Bathroom Home Remodeling
Bathroom Home Remodeling
Bathroom Home Remodeling
Bathroom Home Remodeling

+19

Response time2 days
4 neighbors recently requested a quote
Recommended by85%of homeowners
Avatar for Post Construction
Post Construction
4.3(
7
)

Serving Leon, KS and surrounding areas

Approved

In business since 2000

Customers say: Quick response

"Before my wife and I chose Michael (Post Construction), four other local and reputable contractors bid for a complete basement finish.  Everything from framing, electrical, plumbing, painting, tiling, and flooring.  Each contractor had to be insured and licensed to build in the county we live in as well as handle all proper permits.   Although Michael’s bid was reasonable in comparison, what impressed us the most during the walkthrough interview was that he had the right set of knowledge and skillset that gave us a sense of comfort and trust.  Before hiring Michael, we also confirmed references from other contractors who highly recommended his work. Each stage of construction was scheduled and managed well especially when issues needed to be addressed.  For instance, when the tile supplier originally supplied the wrong colored tile for the bathroom,  Michael’s team quickly resolved the issue with the supplier to order and deliver the correct tile and rescheduled the tile work all of which was completed in less than a week. His 27 years of professional experience was demonstrated well especially in some of the smallest details.  For example, knowing to apply an extra measure of caulking behind the trim and crown molding to prevent rope lighting from penetrating through the seams.  He provided plenty of helpful suggestions to improve aesthetics such as covering the electrical panel with a custom-made door to match the trim. We are certainly very pleased with the results and the decision to go with Post Construction.  We have additional long-term remodeling ideas in the future that we will definitely consider re-hiring Post Construction to perform the work."
After - Pantry
Troy's ADA Project
After - Stove side
Troy's ADA Project
After - Kitchen Bar

+44

Response time11 hrs
Response rate98%
Recommended by100%of homeowners
Avatar for Full Send Contracting
Full Send Contracting
New to Angi

Serving Leon, KS and surrounding areas

Approved

Free estimates

Small jobs welcome

Offers commercial services

Full Send Contracting is two buddies who decided to put their pea brains & skills together to start a business we established it in 2026 but we have years of experience to knock out any idea you have in mind give us a call @316-768-0112 FREE QUOTES!

Kitchen remodel
Kitchen remodel
Kitchen remodel
Kitchen remodel
Kitchen remodel

+2

ICT Investors and Remodeling LLC
New to Angi

Serving Leon, KS and surrounding areas

Approved

In business since 2025

Free estimates

Small jobs welcome

We’re a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guaranteeing your satisfaction!

5 neighbors recently requested a quote
Avatar for Impact construction
Impact construction
5.0(
5
)

Serving Leon, KS and surrounding areas

In business since 2015

Free estimates

"The owner Gene was very professional and worked well under pressure. We had a deadline of 2 weeks to get a bar and other things completed and Impact Construction delivered on time! We highly recommend this company."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Showing 1-10 of 45
Basement Remodel questions, answered by experts

Walkout basements cost more than other kinds of basements, and can also increase your risk of leaks as well as a loss of insulation, leading to higher heating and cooling costs. Improperly installed walkout basements may lead to structural issues with your foundation, so ensure you’re working with a contractor who has extensive experience with this kind of basement.

Building a bar in the basement will likely add value to your home, although it’s unlikely that you’ll see a significant return on investment (ROI) unless you plan on using the space for you and your guests. If you think you’ll use the area frequently, though, it’s probably worth the investment, and you should see a bump in value if or when you sell your property.

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Yes, you can install a summer kitchen or kitchenette in your basement. They serve similar purposes as outdoor kitchens, keeping the main floor of the house cool and providing another space to cook and congregate. Basement kitchens are also a worthwhile alternative for homeowners without much space in the backyard. They come with a few logistical questions to sort out, though, like ventilation and waterproofing.

The Leon, KS homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.