Top-rated basement remodelers.

Get matched with top basement remodelers in Benton, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Benton, KS?

Select your specific project to find the pro for you.

TRUSTED BY BENTON, KS HOMEOWNERS

  • Average homeowner rating star icon3.9
    Average homeowner rating
  • Verified reviews icon15
    Verified basement remodels reviews

Find Basement remodelers in Benton

Avatar for Johnson Remodel LLC
Johnson Remodel LLC
4.8(
36
)
Basement - Remodel

Serving Benton, KS and surrounding areas

Approved

In business since 2010

Free estimates

Warranties offered

"They painted my exterior and interior. I was very happy with the outcome. But I have been trying to get ahold of them for more work but have had no replay"
Bathroom Home Remodeling
Bathroom Home Remodeling
Bathroom Home Remodeling
Bathroom Home Remodeling
Bathroom Home Remodeling

+19

Response time2 days
3 neighbors recently requested a quote
Recommended by85%of homeowners
Avatar for Homeland Construction Services, LLC
Homeland Construction Services, LLC
4.6(
15
)
Basement - Remodel

Serving Benton, KS and surrounding areas

Approved

In business since 2000

Free estimates

Warranties offered

"We contacted Heartland Construction after some severe storm flooded our basement and damaged our roof. Not only did they immediately respond to temporarily tarp the roof damage, they put together a comprehensive plan to attack the water damage issue head on and even helped us with financing options for some other remodel work that our older home needed done. Roof, windows, siding, new bump out edition, basement egresses, ceiling and paint. They do it all. Highly recommend."
After Addition
Morton Building Addition
Sunroom
Living Room
Kitchen

+2

Response time1 day
19 neighbors recently requested a quote
Recommended by100%of homeowners
Avatar for Post Construction
Post Construction
4.3(
7
)
Basement - Remodel

Serving Benton, KS and surrounding areas

Approved

In business since 2000

Customers say: Quick response

"Before my wife and I chose Michael (Post Construction), four other local and reputable contractors bid for a complete basement finish.  Everything from framing, electrical, plumbing, painting, tiling, and flooring.  Each contractor had to be insured and licensed to build in the county we live in as well as handle all proper permits.   Although Michael’s bid was reasonable in comparison, what impressed us the most during the walkthrough interview was that he had the right set of knowledge and skillset that gave us a sense of comfort and trust.  Before hiring Michael, we also confirmed references from other contractors who highly recommended his work. Each stage of construction was scheduled and managed well especially when issues needed to be addressed.  For instance, when the tile supplier originally supplied the wrong colored tile for the bathroom,  Michael’s team quickly resolved the issue with the supplier to order and deliver the correct tile and rescheduled the tile work all of which was completed in less than a week. His 27 years of professional experience was demonstrated well especially in some of the smallest details.  For example, knowing to apply an extra measure of caulking behind the trim and crown molding to prevent rope lighting from penetrating through the seams.  He provided plenty of helpful suggestions to improve aesthetics such as covering the electrical panel with a custom-made door to match the trim. We are certainly very pleased with the results and the decision to go with Post Construction.  We have additional long-term remodeling ideas in the future that we will definitely consider re-hiring Post Construction to perform the work."
After - Pantry
Troy's ADA Project
After - Stove side
Troy's ADA Project
After - Kitchen Bar

+44

Response time11 hrs
Response rate98%
Recommended by100%of homeowners
Avatar for Maverick Maintenance and Construction
Maverick Maintenance and Construction
5.0(
8
)
Basement - Remodel

Serving Benton, KS and surrounding areas

Approved

In business since 2020

Free estimates

Warranties offered

"Maverick Maintenance and Construction did a fantastic job on my project. Their team was highly responsive right from the start and maintained excellent communication while they worked. They are truly wonderful folks to deal with, and I already plan on using them again for a bigger project down the road."
New Kitchen
Farm House
Farm House
Dinning Room
Cedar Room

+2

3 neighbors recently requested a quote
Avatar for Full Send Contracting
Full Send Contracting
New to Angi
Basement - Remodel

Serving Benton, KS and surrounding areas

Approved

Free estimates

Small jobs welcome

Offers commercial services

Full Send Contracting is a guy who decided to put his pea brain & skills together to start a business we established it in 2026 but we have years of experience to knock out any idea you have in mind give us a call @316-768-0112 FREE QUOTES!

Kitchen remodel
Kitchen remodel
Kitchen remodel
Kitchen remodel
Kitchen remodel

+2

ICT Investors and Remodeling LLC
New to Angi
Basement - Remodel

Serving Benton, KS and surrounding areas

Approved

In business since 2025

Free estimates

Small jobs welcome

We’re a locally owned and operated company that values honesty and integrity and treats your home as if it were our own. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We pride ourselves on the quality of our work as well as our commitment to outstanding results. We look forward to building lasting relationships and guaranteeing your satisfaction!

9 neighbors recently requested a quote
Avatar for Impact construction
Impact construction
5.0(
5
)
Basement - Remodel

Serving Benton, KS and surrounding areas

In business since 2015

Free estimates

"The owner Gene was very professional and worked well under pressure. We had a deadline of 2 weeks to get a bar and other things completed and Impact Construction delivered on time! We highly recommend this company."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Avatar for Octagon Construction LLC.
Octagon Construction LLC.
5.0(
6
)
Basement - Remodel

Serving Benton, KS and surrounding areas

In business since 2002

Free estimates

Emergency services offered

"The quality of work performed was amazing. The workers were all very professional. They were very willing to go over the job before work had started to ensure I was getting exactly what I wanted. They were also understanding and willing when I wanted to change a few things during the process. Overall I would hire this company again for any remodeling I need."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+22

Recommended by100%of homeowners
...
Showing 1-10 of 75
Basement Remodel questions, answered by experts

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

For most basement remodels, you’ll want to hire a general contractor. This is for a number of reasons, but the main two are that general contractors have dedicated teams they are comfortable with, and hiring one means you only have to deal with one pro. You may also get a better project quote since they can lump all their work and subcontracting into a single quote. 

Joists and beams are both part of the flooring system above your basement, with the beams spanning the length of your home and getting support from vertical posts underneath, and joists usually spanning half the width of your home with no support posts underneath. The floor joists provide even support to the subflooring and flooring above, and they distribute that load to the beams. The beams then distribute that load down through the support posts to the foundation.

The Benton, KS homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.