Top-rated paving pros.

Best paving pros near Haviland, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Haviland, KS?

Select your specific project to find the pro for you.

Top-Rated Paving pros in Haviland - Updated Nov 2026

DG landscaping
New to Angi
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessInterlocking Pavers for Patios, Walks & Steps - Install

Serving Haviland, KS and surrounding areas

In business since 2020

Free estimates

Credit card accepted

DG landscaping is dedicated to providing our customers with the best quality and craftsmanship. We are here to build relationships with our customers and communities and to provide our employees with a great place to work. We look forward to working with you!

Paving Services FAQs, answered by experts

Whether you decide to DIY paver installation or want to hire a pro, it’s smart to understand the process. First, you’ll need to prepare the area by clearing away grass and dirt. Next, you’ll add the paver base of gravel and sand before laying the pavers on top. You may need to cut pavers to fit your space or the landscaping design and add edging stones.

Asphalt dries and cures best between 50 and 85 degrees Fahrenheit. This range allows moisture to evaporate quickly without causing the asphalt to cool too fast, which can negatively affect the drying process. However, keep in mind that other weather conditions can also affect curing and drying times, such as precipitation and humidity.

The stones do not work well on uneven ground. If the stones are not buried into the ground and made level upon installation, they almost certainly will shift or crack on uneven ground. Additionally, rainwater or water from sprinklers can run under the edge of an uneven paver, causing erosion. In a freeze and thaw cycle, trapped water under the paver can cause the problem to worsen by shifting the stepping stones around. Use a bubble level to make sure the ground under each paver is as even as possible, even if the nearby ground is uneven.

Box fill refers to the maximum number of conductors that can be contained within a wiring enclosure box, as well as the total volume of the components. Determining the allowable number of conductors in a box requires adding up the number of conductors, clamps, support fittings, devices and equipment, and equipment grounding conductors to make sure you’re within the allowable volume.

Depending on project size, typically 1 to 3 days, including preparation and installation.

The Haviland, KS homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.