Top-rated paving pros.

Get matched with top paving pros in Coldwater, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your paving service project in Coldwater, KS?

Select your specific project to find the pro for you.

Find Paving pros in Coldwater

Paving Services questions, answered by experts

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

Yes, recycled asphalt driveway costs can be substantially lower than new asphalt. With new asphalt costing between $90 and $190 per ton, this option can cost as much as 10 times more than laying down asphalt millings.

Yes, you should lightly wet the sand with a hose before laying the pavers on top. This activates the bonding agents in the sand, ensuring that your pavers don’t shift around during the installation process. However, you should make sure that the sand is not soaked; overwatering can cause the sand and pavers to not set properly.

A traditional driveway gate isn’t your only option when installing a barricade in front of your driveway. A security gate like a swing gate, double swing gate, bi-folding gate, vertical gate, or pivot gate could work just as well as your driveway gate—if not better for your home depending on which qualities you’re after. Like sliding driveway gates, many of these alternatives work with automatic features that simplify entering and exiting your property.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

The Coldwater, KS homeowners’ guide to paving services

From average costs to expert advice, get all the answers you need to get your job done.