Top-rated basement remodelers.

Get matched with top basement remodelers in Yoder, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Yoder, IN?

Select your specific project to find the pro for you.

Find Basement remodelers in Yoder

Nunez General Construction Llc
New to Angi

Serving Yoder, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

Harvest Build Co
New to Angi

Serving Yoder, IN and surrounding areas

Approved

Proudly serving Michiana with dependable handyman services, new construction, and quality craftsmanship. Whether it’s home repairs, installations, remodeling projects, or everyday maintenance, we’re here to help bring your vision to life.\n\nBuilt on faith, honesty, and hard work, we believe in treating every home as if it were our own. No job is too small—we’re committed to serving our community with integrity and excellence.\n\nFaith. Family. Craftsmanship.\n\nContact us today for a free estimate!

Avatar for Over the Top Counters and Floors
Over the Top Counters and Floors
New to Angi

Serving Yoder, IN and surrounding areas

Approved

In business since 2014

Free estimates

Offers commercial services

Over the Top Counters and Floors specializes in designing and creating top quality, made-to-order, epoxy countertops and flooring. We can apply this to existing surfaces which makes OVER THE TOP great for low budget remodels and cutting the cost of real looking stone in half! Free Estimates over the phone, some may need a free in-home quote. All products are fully customizable with a variety of color, backed by a 100% satisfaction guarantee. New special every month! Call Now!

Response time20 mins
Avatar for American Basement Solutions
American Basement Solutions
4.3(
46
)

Serving Yoder, IN and surrounding areas

In business since 1992

Credit card accepted

"Vendor could provide foundation service, but not one of the other services we requested (simply not a service this vendor performs); we therefore chose a different path. Vendor provided a detailed and valuable foundation report that was essential towards our efforts, so we are very grateful for that. We will seriously consider this vendor for future work."
Additional Photos
Additional Photos
Additional Photos
Recommended by85%of homeowners
Avatar for Changes Unlimited
Changes Unlimited
4.4(
70
)

Serving Yoder, IN and surrounding areas

In business since 1986

Free estimates

"Nick and his team did an excellent job remodeling our very dated basement and doing several other smaller projects. The price was definitely reasonable. We appreciated the quality of the work as well as the willingness to work with us to provide exactly what we wanted done. The communication during all of the projects was great. We would definitely hire them again for other projects"
Additional Photos
Recommended by94%of homeowners
...
Showing 1-10 of 71
Basement Remodel questions, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Any bowing in a basement wall indicates a problem that needs to be addressed by a professional. If your basement wall bows more than 1 inch, it's time for an inspection. Generally, a wall can bow up to 30% of its thickness (around 2.5 inches for an 8-inch-thick wall) before it becomes an urgent situation. Bowing of 2 to 4 inches is more straightforward to fix than bowing of more than 4 inches, which will require significant repairs. If the bowing is more than 6 inches, the wall will likely need to be replaced. The sooner you address the problem, the easier and less expensive the repair will be.

Although it’s not required, air ventilation in a finished basement can help improve the air quality, prevent moisture and mold issues, keep musty odors away, and also maintain the air quality throughout the rest of your home. Proper ventilation will help maintain the value of your investment in finishing your basement. Try basement ventilation methods like installing vents or a dehumidifier for best results.

The Yoder, IN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.