Top-rated basement remodelers.

Get matched with top basement remodelers in Geneva, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Geneva, IN?

Select your specific project to find the pro for you.

Find Basement remodelers in Geneva

Nunez General Construction Llc
New to Angi
Basement - Remodel

Serving Geneva, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

Avatar for Over the Top Counters and Floors
Over the Top Counters and Floors
New to Angi
Basement - Remodel

Serving Geneva, IN and surrounding areas

Approved

In business since 2014

Free estimates

Offers commercial services

Over the Top Counters and Floors specializes in designing and creating top quality, made-to-order, epoxy countertops and flooring. We can apply this to existing surfaces which makes OVER THE TOP great for low budget remodels and cutting the cost of real looking stone in half! Free Estimates over the phone, some may need a free in-home quote. All products are fully customizable with a variety of color, backed by a 100% satisfaction guarantee. New special every month! Call Now!

Response time20 mins
Avatar for Crawlspaces/Basement Waterproofing Solution
Crawlspaces/Basement Waterproofing Solution
4.2(
29
)
Basement - Remodel

Serving Geneva, IN and surrounding areas

In business since 1999

Free estimates

Credit card accepted

"The work was good for the most part.  I was pleased with the actual work downstairs and the pricing but I was disappointed in a couple of things like they missed some of the door from the way out to the basement.  They also said that there would be no dust or dirt in the kitchen but when we were out there, there was dust on the stove so I wasn’t pleased with that.  I understand that workers have to use the bathrooms but water was shut off and no one could figure out how to turn on the water so they did their business, opened the toilets and never flushed them; all three toilets of the house.  I was very not pleased with that.  One would think that somebody that is in construction business could go in the basement area and figure out how to turn on the valve so that they could flush the toilets.  It was gross.  They ripped out everything down in the basement and that part of it was fine; I thought that they did a good job there.  The price was very good."
Before...
After...
Recommended by94%of homeowners
Avatar for American Basement Solutions
American Basement Solutions
4.3(
46
)
Basement - Remodel

Serving Geneva, IN and surrounding areas

In business since 1992

Credit card accepted

"It was a small job. They sealed the vents to the crawlspace, then, since there was already solid insulation panels on the walls, put a vapor/moisture barrier, in the form of a tarp, 4 feet wide and as long needed, completely around the crawlspace. It was then sealed to the walls with "nails" and adhesive. This seals the wood frame of the house from the 'Outside", the ground, which is the floor of the crawlspace. A 20 mil thick, quite heavy, "floor" was installed, also in the form of a tarp, It went up the walls about 3 feet and was taped to the 'tarp" on the walls, using a tape made for this application. The piers were wrapped with the same stuff and taped to seal the inside from the outside. the "floor" is also a vapor/moisture barrier, but, heavy enough to walk on if needed. This basically makes the crawlspace another room, rather than the outside. Our house is one year old and was already getting mold on the floor joists. Since the air in the crawlspace will now be heated in the winter and cooled in the summer, just like the rest of the house, the mold and cold (52 degrees) floors we experienced last winter will hopefully be eliminated. We shall see when dumb winter gets here."
Additional Photos
Additional Photos
Additional Photos
Recommended by85%of homeowners
Avatar for CALIBER CONSTRUCTION
CALIBER CONSTRUCTION
4.2(
53
)
Basement - Remodel

Serving Geneva, IN and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"I'm so happy. They were so professional. Did what they promised to do. On time. But, the best part. They were so clean. My yard when they were done was spotless. The workers were respectfully of my lawn and flowers. And the my Roof looks perfect. I would recommend them all day."
Recommended by88%of homeowners
Showing 1-10 of 47
Basement Remodel questions, answered by experts

It is generally more affordable to finish a basement than an attic, though it ultimately depends on how you plan to use the space. The average cost to finish a basement ranges from $7 to $23 per square foot, while attic renovation costs $30 to $60 per square foot. However, a simple attic conversion to a storage space will cost significantly less.

Create a checklist, reimagine the space use, set a realistic budget, choose materials and aesthetic details, and get professional support for guidelines and troubleshooting.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The best type of basement ventilation system depends on your budget, the moisture in your basement’s air, and the types of windows you have down there. You should consider all of these factors when choosing a ventilation system. However, the most effective method for basement ventilation is an energy recovery ventilator (ERV) or a whole-house ventilation system, which preheats or precools incoming air from the outside while also managing water vapor.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The Geneva, IN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.