Top-rated deck maintenance specialists.

Get matched with top deck maintenance specialists in Sunman, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your deck maintenance project in Sunman, IN?

Select your specific project to find the pro for you.

Find Deck maintenance specialists in Sunman

Avatar for Tri State Complete Home Repair and Maintenance
Tri State Complete Home Repair and Maintenance
4.6(
60
)
Deck, Fence, Patio or Porch - Clean and SealDeck, Fence, Patio or Porch - Clean and Seal - For Business

Serving Sunman, IN and surrounding areas

Approved

Super Service Award Winner

In business since 1996

Free estimates

Emergency services offered

"We cannot say enough great things about Tristate Complete Home Repair! We just finished up a partial renovation of the interior of our Hoosier Homestead farmhouse, and Tristate did a fabulous job! The house had spent decades under the care of our aging parents, so it needed a lot of careful attention to update nearly everything without compromising the unique historical beauty of the house. Owner Tim of Tristate brought decades of renovation experience to our project, leading a crew of workers representing all the trades. This meant fewer delays and mistakes on our project. No regrets here. We look forward to future work from Tristate!"
Remodeling - General Project
Before ☹️
Remodeling - General Project
After! !
Additional Photos

+5

12 neighbors recently requested a quote
Recommended by61%of homeowners
Avatar for General Co
General Co
4.8(
15
)
Deck, Fence, Patio or Porch - Clean and Seal

Serving Sunman, IN and surrounding areas

Approved

In business since 2022

Free estimates

Warranties offered

"Excellent service and quality work! We are very pleased with the work Chris and General Co. did on our driveway, sidewalk, and pool deck power washing and sealant job. Fast, efficient and high quality. Great to see another excellent company here in Dearborn County!"
Patio Restoration
Patio Restoration
Before
House Wash
Dollar Tree Cleaning

+6

Response time9 hrs
34 neighbors recently requested a quote
Avatar for Maximus General Contracting LLC
Maximus General Contracting LLC
4.4(
135
)
Deck, Fence, Patio or Porch - Clean and SealDeck, Fence, Patio or Porch - Clean and Seal - For Business

Serving Sunman, IN and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I called Maximus Contracting about needing a new roof because of hail/wind damage.  I needed it quickly because we're selling the house soon, and I didn't have a big budget to work with because I received less from my insurance company than I was expecting.  Eric called back quickly and gave me a very reasonable estimate for the work.  The new shingles are of better quality than my original roof, and it looks great.  I finalized my shingle choice with Eric, and the crew completed the work the very next day.  Eric even came out to my office a couple times because my schedule doesn't often allow me to be at home during the day.  All in all, it was a great experience.  I feel confident that I received a great value, and the customer service was exceptional.  I would highly recommend using this company!
"
Recommended by92%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Deck, Fence, Patio or Porch - Clean and SealDeck, Fence, Patio or Porch - Clean and Seal - For Business

Serving Sunman, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for LC property clean up
LC property clean up
5.0(
9
)
Deck, Fence, Patio or Porch - Clean and SealDeck, Fence, Patio or Porch - Clean and Seal - For Business

Serving Sunman, IN and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"It went very well, the service was prompt and professional, they paid attention to the details of what I needed done. They were mindful of my pets, and respectful of my property, they pulled weeds, laid down some new liner and mulch on my landscape, mowed my yard, and extended my privacy fence so that it would enclose my back yard and give a more private feel to our swimming pool."
27 tvs connected in a home
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+28

Recommended by100%of homeowners
Showing 1-10 of 39
Deck Maintenance questions, answered by experts

The least expensive way to build a pool deck is with concrete deck blocks, pressure-treated lumber, and the appropriate hardware for hanging joists and securing deck boards. With these basic yet durable deck materials, you'll have a pool deck that's built to last without the high price tag. You should also stain or seal the deck to protect it against the elements.

You can build an outdoor kitchen on a deck, but you should choose composite decking since it's more heat-resistant. Metal deck materials like steel and aluminum are also good choices because they're less flammable than wood. You should also consider the weight of the kitchen—make sure your deck can support it and any appliances you plan to use. You should consult a structural engineer to confirm exactly how much weight your deck can safely support when building an outdoor kitchen. 

Any wood deck provides some ventilation to the area below, as is the nature of that type of deck design. However, areas that experience excessive humidity and associated moisture benefit greatly from a dedicated ventilation system in the form of strip vents. This addition helps the various wood boards contract and expand evenly throughout the years and reduces the chances of twisting, warping, and buckling.

The time to build a vinyl deck varies based on factors like size, the complexity of the design, and weather conditions. Generally, a straightforward project might take a few days to a couple of weeks for preparation, installation, and any necessary inspections. However, larger or more intricate designs may extend the timeline. Timely acquisition of permits, efficient planning, and coordination with contractors will all help to make the construction process as smooth and quick as possible.

Ultimately, overapplication of stain can compromise the deck's appearance, durability, and longevity. It may result in an uneven finish, with excess stain pooling, dripping, or drying into thick patches. It can also obscure the wood's natural grain and texture, detracting from the desired aesthetic. Moreover, excessive staining may not fully penetrate the wood, leading to poor adhesion and premature wear. Additionally, thick layers of stain are prone to peeling, cracking, and blistering as they struggle to bond with the surface. 

The Sunman, IN homeowners’ guide to deck maintenance services

From average costs to expert advice, get all the answers you need to get your job done.