Top-rated basement remodelers.

Get matched with top basement remodelers in Milroy, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Milroy, IN?

Select your specific project to find the pro for you.

Find Basement remodelers in Milroy

Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)
Basement - Remodel

Serving Milroy, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"I added or made changes to the scope of work (siding). Satisfied with work, guys are great. Wish they had more availability for more work."
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
9 neighbors recently requested a quote
Recommended by96%of homeowners
Nunez General Construction Llc
New to Angi
Basement - Remodel

Serving Milroy, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)
Basement - Remodel

Serving Milroy, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"this is the second time we have had Legacy work on our home. Our home was built in 1992 and the windows and doors were not looking as good as we wanted. This time around we replaced 12 windows and two doors. Legacy also painted a fence for us and replaced some cedar that was bad"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for American Basement Solutions
American Basement Solutions
4.3(
46
)
Basement - Remodel

Serving Milroy, IN and surrounding areas

In business since 1992

Credit card accepted

"Vendor could provide foundation service, but not one of the other services we requested (simply not a service this vendor performs); we therefore chose a different path. Vendor provided a detailed and valuable foundation report that was essential towards our efforts, so we are very grateful for that. We will seriously consider this vendor for future work."
Additional Photos
Additional Photos
Additional Photos
Recommended by85%of homeowners
Avatar for CALIBER CONSTRUCTION
CALIBER CONSTRUCTION
4.2(
53
)
Basement - Remodel

Serving Milroy, IN and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Leonard was the point person for Caliber Construction. He was extremely helpful in working through the issues with our insurance company, who was inclined to not pay for a roof replacement. Leonard was able to identify damage to each section of our roof, document the damage, and articulate the condition to the adjuster. I truly believe without Leonard helping through the process, we would not have gotten a favorable verdict from the insurer.
The tear off and installation went well with no issues. Inspection of the roof both from above and from the attic indicated a quality job with no issues. Leonard was on time, met the budget, and completed a thorough walk-through detailing all of the outstanding items or issues encountered in the installation. I am very pleased with Caliber construction.
"
Recommended by88%of homeowners
...
Showing 1-10 of 59
Basement Remodel questions, answered by experts

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

While framing a basement is not as difficult as finishing a basement, it's something you should typically leave to the pros. That’s because if something is installed correctly, it will affect your entire basement. However, you can take care of some of the smaller tasks, like filling holes or putting up some insulation.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Milroy, IN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.