Top-rated basement remodelers.

Get matched with top basement remodelers in Milroy, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Milroy, IN?

Select your specific project to find the pro for you.

Find Basement remodelers in Milroy

Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)

Serving Milroy, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"I added or made changes to the scope of work (siding). Satisfied with work, guys are great. Wish they had more availability for more work."
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
9 neighbors recently requested a quote
Recommended by96%of homeowners
Nunez General Construction Llc
New to Angi

Serving Milroy, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Milroy, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"this is the second time we have had Legacy work on our home. Our home was built in 1992 and the windows and doors were not looking as good as we wanted. This time around we replaced 12 windows and two doors. Legacy also painted a fence for us and replaced some cedar that was bad"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for American Basement Solutions
American Basement Solutions
4.3(
46
)

Serving Milroy, IN and surrounding areas

In business since 1992

Credit card accepted

"Vendor could provide foundation service, but not one of the other services we requested (simply not a service this vendor performs); we therefore chose a different path. Vendor provided a detailed and valuable foundation report that was essential towards our efforts, so we are very grateful for that. We will seriously consider this vendor for future work."
Additional Photos
Additional Photos
Additional Photos
Recommended by85%of homeowners
Avatar for CALIBER CONSTRUCTION
CALIBER CONSTRUCTION
4.2(
53
)

Serving Milroy, IN and surrounding areas

In business since 2004

Free estimates

Emergency services offered

"Leonard was the point person for Caliber Construction. He was extremely helpful in working through the issues with our insurance company, who was inclined to not pay for a roof replacement. Leonard was able to identify damage to each section of our roof, document the damage, and articulate the condition to the adjuster. I truly believe without Leonard helping through the process, we would not have gotten a favorable verdict from the insurer.
The tear off and installation went well with no issues. Inspection of the roof both from above and from the attic indicated a quality job with no issues. Leonard was on time, met the budget, and completed a thorough walk-through detailing all of the outstanding items or issues encountered in the installation. I am very pleased with Caliber construction.
"
Recommended by88%of homeowners
...
Showing 1-10 of 58
Basement Remodel questions, answered by experts

If you don’t have a crawl space but have a partial basement you want to make deeper, you can expect to spend a little less—between $40,000 and $90,000 on average. However, if you’re not adding new finished square footage, you won’t see much in the way of ROI.

You should always use high-quality lumber for your framing in order to ensure it will last the test of time and resist moisture. Use 2-foot by 4-foot lumber that is pressure-treated for your framing.

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Milroy, IN homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.