Top-rated contractors.

Get matched with top contractors in Dunkirk, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your contractor service project in Dunkirk, IN?

Select your specific project to find the pro for you.

Find Contractors in Dunkirk

Nunez General Construction Llc
New to Angi

Serving Dunkirk, IN and surrounding areas

Approved

Free estimates

Credit card accepted

Offers commercial services

With three years of hands-on experience in framing, remodeling, and home additions, We provide reliable and detail-oriented work throughout all Indiana and Ohio. We have experience with residential & commercial framing, renovations, and structural improvements.\n\nI believe in doing things the right way — solid structure, clean finishes, and clear communication. My goal is to deliver quality results that homeowners can trust.

Avatar for CORNERSTONE PEST & REMEDIATION LLC
CORNERSTONE PEST & REMEDIATION LLC
New to Angi

Serving Dunkirk, IN and surrounding areas

Approved

Emergency services offered

Warranties offered

Small jobs welcome

Cornerstone Pest and Remediation LLC is proud to serve our community with reliable pest control and quality remodeling services, also water-proofing,Floor Cleaning, built on accountability and execution. We take this work seriously—listening first, understanding your concerns, and following through with solutions that actually last. Whether we’re protecting your home from pests or improving it through remodeling, we approach every project with care, attention to detail, and respect for your time and property. Our commitment is simple: show up, do it right, and take care of the people who trust us. We’re here to serve, and we stand behind every job we touch.

Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Dunkirk, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for Maximus General Contracting LLC
Maximus General Contracting LLC
4.4(
135
)

Serving Dunkirk, IN and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Eric removed two layers of shingles from our 40 year old roof and replaced them with new 3D Duration shingles. The job started with us needing someone to replace some siding on the chimney due to water leaking in behind the siding causing deterioration and paint peeling off of the siding panels. The repair which we were pursuing was relatively small and consequently we contacted several qualified contractors and they were not willing to even come and scope out our job. Someone referred us to Maximus and when I called and talked to Eric, he was willing to take on the project even though it was small. When he showed up to evaluate the situation and give an estimate for the job, he discovered that the cause of our problem was due to the concrete cap around our chimneys that had cracked and separated and allowed water to seep in and deteriorate the trim boards and siding.We agreed to have him replace the siding and trim boards and to replace the chimney chase because his quote was very reasonable. During this same visit, I was asking him about the condition of the shingles on the roof because they had been in place for 20 years. They were showing signs of wear but he said they could last another year or two. I inquired as to the cost of him roofing the house too while he was doing the other jobs for us and that quote seemed very reasonable so I agreed to that job as well. He has just finished the total project in less than a week and everything looks really good. He maintained the schedule that he promised and he was on site nearly every day to make sure things were running smooth. We will definitely call Maximus again when the need arises.
"
Recommended by92%of homeowners
Avatar for Lawrence Property Maintenance LLC
Lawrence Property Maintenance LLC
5.0(
19
)

Serving Dunkirk, IN and surrounding areas

In business since 2023

Free estimates

Emergency services offered

"Super responsive guy, is honest, friendly, and affordable. I was quoted so much money for my project, and if I wouldn’t have messaged Lawrence property management, I would have paid close to $500 for the service that I only ended up paying $200 for."
New pump, some new fittings
Seal coating
Well pump
Seal coating
Seal coating

+50

Recommended by100%of homeowners
All Star Building Corp
4.4(
28
)

Serving Dunkirk, IN and surrounding areas

In business since 2001

Free estimates

Emergency services offered

"The employees at All Star Building Corp. were out standing they were on time and worked was done in a timely manner.
One of the things that I liked most about All Star Building Corp, was the way that they took note of a little play pool in the back yard and my dogs. I noticed that they went out of there way to control the mess when removing my old roof. I know that all contractors in this line of work try to do this, but these guys took it to a new level, I had to stop in at the house a few times while they were working they did not know I was there, but I noticed that they were going out of their way to be sure that none of the old roof or nails fell in the back yard. Now I did not ask them to do this, don't even think that I said any thing about my dogs, that is what made me notice. They were just doing all they could to keep everything contained. When they were done my son and I did a very thorough inspection of the yard for the safety of the dogs and found no shingles or nails any where.
The fact is they did a great job on all the work they had to do and also cared enough to take the extra steps to not put my dogs at risk. This meant a lot to me.
More companies should be like this."
Recommended by87%of homeowners
Avatar for ROOSTER DRYWALL LLC
ROOSTER DRYWALL LLC
4.7(
33
)

Serving Dunkirk, IN and surrounding areas

In business since 2005

Free estimates

Emergency services offered

"The work went well. It was very messy so I recommend anyone hiring this contractor to be prepared for just how messy this project can be. My floors, carpets and furniture were so covered in material leftover from sanding that it took us three days to clean. Everything was white as snow. Also, do not wet the sanding debris, make sure you dry wipe, sweep and vacuum before wiping things down with anything damp/wet. Again, can't stress enough that the final product was great, but the process is messy. Be prepared."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+133

Recommended by93%of homeowners
...
Showing 1-10 of 54
Unfinished Carpentry questions, answered by experts

A cross brace for a fence gate should stretch from the top corner of the gate’s hinge side to the bottom corner of its latch side at a 45-degree angle to the bottom of the gate. This positioning distributes the bulk of the gate’s weight to the base of the post, taking pressure off the top hinge.

For maximum stability, install grab bars on wall studs, as this will adequately support the weight. However, if you don't have access to studs, you can get by with wall anchors. If opting for the latter, choose specialty hollow wall anchors. 

Framing most homes takes anywhere between five and eight weeks to complete. You’ll need to account for inclement weather conditions, material shipment times, the number of crew members, and the weight of your materials. If the weather is too hot, wet, or cold for the installation, this process could take closer to eight weeks.

If the bowing basement wall is less than 2 inches, steel or carbon fiber straps are the best solution. For bowing that is more than 2 inches, wall anchors are the most effective. A contractor can help you decide the best method of repair for your home's foundation and also address the root cause of the trouble.

Accurate measurements, sturdy materials, and seamless integration with other structures.

The Dunkirk, IN homeowners’ guide to contractor services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"