Top-rated deck maintenance specialists.

Get matched with top deck maintenance specialists in Austin, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your deck maintenance project in Austin, IN?

Select your specific project to find the pro for you.

Find Deck maintenance specialists in Austin

Avatar for Brady maschino
Brady maschino
New to Angi

Serving Austin, IN and surrounding areas

Approved

Free estimates

Emergency services offered

Small jobs welcome

I’m a jack of all trades. I was raised to work hard and I have experience in multiple areas. I do excavation for my full time job so I am just looking for a little extra work on the side. I have a truck and trailer so my services can expand beyond what is listed. Thank you for the opportunity!

Cole Contracting
New to Angi

Serving Austin, IN and surrounding areas

Approved

In business since 2019

Free estimates

Emergency services offered

Cole Construction and Remodeling is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

1 neighbors recently requested a quote
Avatar for Maximus General Contracting LLC
Maximus General Contracting LLC
4.4(
135
)

Serving Austin, IN and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"I called Maximus Contracting about needing a new roof because of hail/wind damage.  I needed it quickly because we're selling the house soon, and I didn't have a big budget to work with because I received less from my insurance company than I was expecting.  Eric called back quickly and gave me a very reasonable estimate for the work.  The new shingles are of better quality than my original roof, and it looks great.  I finalized my shingle choice with Eric, and the crew completed the work the very next day.  Eric even came out to my office a couple times because my schedule doesn't often allow me to be at home during the day.  All in all, it was a great experience.  I feel confident that I received a great value, and the customer service was exceptional.  I would highly recommend using this company!
"
Recommended by92%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Austin, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for Freedom Windows And Doors LLC
Freedom Windows And Doors LLC
5.0(
9
)

Serving Austin, IN and surrounding areas

Free estimates

Credit card accepted

"Measured and order materials needed ahead of job. Arrived on time to do work. Attention to detail was exceptional. Work was completed in one day and turned out better than was before. Appreciated that extra care was taken to not make a mess out of entire house. Have referred them out to family, friends, coworkers, and neighbors. The highest compliment you can give a contractor !"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

Recommended by100%of homeowners
Avatar for K&G Handyman Services
K&G Handyman Services
5.0(
3
)

Serving Austin, IN and surrounding areas

In business since 2022

Free estimates

"Excellent service and completed in a timely manner, would highly recommend them very courteous and respectful as well. Look forward to hiring them for future projects!"
Response time2 hrs
Recommended by33%of homeowners
Showing 1-10 of 38
Deck Maintenance questions, answered by experts

The time to build a vinyl deck varies based on factors like size, the complexity of the design, and weather conditions. Generally, a straightforward project might take a few days to a couple of weeks for preparation, installation, and any necessary inspections. However, larger or more intricate designs may extend the timeline. Timely acquisition of permits, efficient planning, and coordination with contractors will all help to make the construction process as smooth and quick as possible.

You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.

While experienced DIYers may take on the challenge, hiring a licensed professional is often the best route, especially for larger or elevated structures. A local deck contractor is typically the best pro for the job, as they have specialized experience and are knowledgeable about local building codes, ensuring your deck is built safely and designed to last. Other professionals who can build a deck include general contractors and carpenters, who may be more readily available in some regions.

Yes, you can build a deck over your outdoor HVAC unit, but you need to leave at least 5 feet of vertical clearance above the unit. If you don’t want your deck to be that high off the ground, you could build a floating deck in another part of your yard—again, as long as you leave at least 4 feet of horizontal space between the deck and your AC unit.

The best way to sand a deck is by cleaning it, sanding the boards and stairs with 60- or 80-grit sandpaper, and sanding the railings and posts with 80-grit sandpaper. You should sand in the direction of the wood grain to avoid damaging the timber. When sanding your deck, use medium pressure and aim for an even sand. Pressing too hard with a sander can damage decks, as most are softwoods.

The Austin, IN homeowners’ guide to deck maintenance services

From average costs to expert advice, get all the answers you need to get your job done.